Attenzione: i dati modificati non sono ancora stati salvati. Per confermare inserimenti o cancellazioni di voci è necessario confermare con il tasto SALVA/INSERISCI in fondo alla pagina
Catalogo dei prodotti della ricerca
The process of prevention planning in Italy: a preliminary analysis of 705 projects included in Regional Prevention Plans (PRPs) / Rosso, A., Massimi, A., Marzuillo, C., Unim, B.A., Rinaldi, A., de Belvis, A.g., LA TORRE, G., Federici, A., Villari, P.. - In: EUROPEAN JOURNAL OF PUBLIC HEALTH. - ISSN 1101-1262. - ELETTRONICO. - 23 (suppl 1):(2013), pp. 178-178. (6th European Public Health Conference Health in Europe: are we there yet? Learning from the past, building the future Brussels, 13 - 16 November 2013) [10.1093/eurpub/ckt123.079].
The process of prevention planning in Italy: a preliminary analysis of 705 projects included in Regional Prevention Plans (PRPs)
6th European Public Health Conference Health in Europe: are we there yet? Learning from the past, building the future
Background
Italian Regions developed their Regional Prevention Plans 2010-2012 (PRPs) following the guidance provided by the Ministry of Health’s National Prevention Plan 2010-2012 (PNP). Within PRPs, each Region should implement projects in the areas of universal prevention, prevention in populations at risk, predictive medicine and prevention of complications and recurrence of diseases. A preliminary analysis of projects included in the 19 PRPs was conducted with the aim to identify strengths and weaknesses in prevention planning and to provide indications to strengthen regional capacities in this area.
Methods
A specific tool was designed by a Scientific Committee promoted by the Italian Ministry of Health to conduct an evidence-based analysis of PRPs’ projects. The analysis explored different items, such as the coherence of regional projects with local contexts and policies, the degree of attention to specific public health issues and the adherence to the principles of Project Cycle Management (PCM) and Evidence Based Prevention (EBP).
Results
A total of 705 projects were developed by Italian Regions. Most of them were in the areas of universal prevention (62.9%) and prevention of population at risk (27.1%). Nearly 20% of projects aimed at the prevention of unhealthy lifestyles. Projects were coherent with the local epidemiological context (82.1%) and with regional health policies (81.3%), even if not all local health needs were addressed. The use of behavioral surveillance systems for prevention planning was not very high (less than 50%). Monitoring & evaluation strategies were included in 97.4% of projects, while the assessment of sustainability was very poor (10%). Adherence to EBP methods was limited (only 22.8% of projects provided evidence of the intervention proposed).
Conclusions
This preliminary analysis of projects included in the 19 PRPs identified strengths and weaknesses in the prevention planning process. The need to increase the adoption of EBP principles is evident, as well as the need for a better assessment of sustainability. Further and more detailed analysis will provide strong evidence to support the development of next PNP and PRPs.
Key messages
Continuous monitoring and assessment could improve the prevention planning system in Italy, which is still on an early phase and therefore needs to strengthen regional capacities in this area.
Italy could represent a good example in Europe in strengthening public health capacities and services through the adoption of an evidence based assessment of the prevention planning process.
04 Pubblicazione in atti di convegno::04c Atto di convegno in rivista
The process of prevention planning in Italy: a preliminary analysis of 705 projects included in Regional Prevention Plans (PRPs) / Rosso, A., Massimi, A., Marzuillo, C., Unim, B.A., Rinaldi, A., de Belvis, A.g., LA TORRE, G., Federici, A., Villari, P.. - In: EUROPEAN JOURNAL OF PUBLIC HEALTH. - ISSN 1101-1262. - ELETTRONICO. - 23 (suppl 1):(2013), pp. 178-178. (6th European Public Health Conference Health in Europe: are we there yet? Learning from the past, building the future Brussels, 13 - 16 November 2013) [10.1093/eurpub/ckt123.079].
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/908776
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo
Citazioni
ND
ND
ND
social impact
Conferma cancellazione
Sei sicuro che questo prodotto debba essere cancellato?
simulazione ASN
Il report seguente simula gli indicatori relativi alla propria produzione scientifica in relazione alle soglie ASN 2023-2025 del proprio SC/SSD. Si ricorda che il superamento dei valori soglia (almeno 2 su 3) è requisito necessario ma non sufficiente al conseguimento dell'abilitazione. La simulazione si basa sui dati IRIS e sugli indicatori bibliometrici alla data indicata e non tiene conto di eventuali periodi di congedo obbligatorio, che in sede di domanda ASN danno diritto a incrementi percentuali dei valori. La simulazione può differire dall'esito di un’eventuale domanda ASN sia per errori di catalogazione e/o dati mancanti in IRIS, sia per la variabilità dei dati bibliometrici nel tempo. Si consideri che Anvur calcola i valori degli indicatori all'ultima data utile per la presentazione delle domande.
La presente simulazione è stata realizzata sulla base delle specifiche raccolte sul tavolo ER del Focus Group IRIS coordinato dall’Università di Modena e Reggio Emilia e delle regole riportate nel DM 589/2018 e allegata Tabella A. Cineca, l’Università di Modena e Reggio Emilia e il Focus Group IRIS non si assumono alcuna responsabilità in merito all’uso che il diretto interessato o terzi faranno della simulazione. Si specifica inoltre che la simulazione contiene calcoli effettuati con dati e algoritmi di pubblico dominio e deve quindi essere considerata come un mero ausilio al calcolo svolgibile manualmente o con strumenti equivalenti.