Routing of high-voltage electric transmission lines for the connection of renewable energy-distributed generation plants is a critical issue from an environmental point of view. A standard methodology that accounts for multiple perspectives, influence factors and is able to mediate between weighted constraints can be a useful tool for the regulating bodies that are involved in approval processes. The methodology can be an effective support to increase reliability, save consumers' money and mitigate the unavoidable impacts of the lines on the population living nearby. In this paper we investigate the suitability of a procedure employed by Terna, the Italian high-voltage transmission system operator, to identify the corridors where to route new overhead transmission lines with the lowest environmental impact. The methodology is based on the subdivision of all the relevant constraints dictated by environmental issues and territory legislations in four main classes. A real case study concerning the design and connection of a wind farm placed near Collarmele, in the center of Italy, shows the effectiveness of the proposed methodology.

Eco-sustainable routing of power lines for the connection of renewable energy plants to the Italian high-voltage grid / Araneo, Rodolfo; Celozzi, Salvatore; Vergine, Chiara. - In: INTERNATIONAL JOURNAL OF ENERGY AND ENVIRONMENTAL ENGINEERING. - ISSN 2008-9163. - ELETTRONICO. - 6:1(2015), pp. 9-19. [10.1007/s40095-014-0143-z]

Eco-sustainable routing of power lines for the connection of renewable energy plants to the Italian high-voltage grid

ARANEO, Rodolfo;CELOZZI, Salvatore;
2015

Abstract

Routing of high-voltage electric transmission lines for the connection of renewable energy-distributed generation plants is a critical issue from an environmental point of view. A standard methodology that accounts for multiple perspectives, influence factors and is able to mediate between weighted constraints can be a useful tool for the regulating bodies that are involved in approval processes. The methodology can be an effective support to increase reliability, save consumers' money and mitigate the unavoidable impacts of the lines on the population living nearby. In this paper we investigate the suitability of a procedure employed by Terna, the Italian high-voltage transmission system operator, to identify the corridors where to route new overhead transmission lines with the lowest environmental impact. The methodology is based on the subdivision of all the relevant constraints dictated by environmental issues and territory legislations in four main classes. A real case study concerning the design and connection of a wind farm placed near Collarmele, in the center of Italy, shows the effectiveness of the proposed methodology.
2015
connection assessment; distributed generation; overhead power lines; wind farm; energy; environmental engineering
01 Pubblicazione su rivista::01a Articolo in rivista
Eco-sustainable routing of power lines for the connection of renewable energy plants to the Italian high-voltage grid / Araneo, Rodolfo; Celozzi, Salvatore; Vergine, Chiara. - In: INTERNATIONAL JOURNAL OF ENERGY AND ENVIRONMENTAL ENGINEERING. - ISSN 2008-9163. - ELETTRONICO. - 6:1(2015), pp. 9-19. [10.1007/s40095-014-0143-z]
File allegati a questo prodotto
File Dimensione Formato  
Araneo_Eco-sustainable-2015.pdf

accesso aperto

Tipologia: Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza: Creative commons
Dimensione 3.27 MB
Formato Adobe PDF
3.27 MB Adobe PDF

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/814147
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 15
  • ???jsp.display-item.citation.isi??? 13
social impact