Construction of the line C of Rome underground is being carried out in a complex context due to the presence of archaeological artefacts, historical buildings and monuments of invaluable value. Along the contract T3 of the line, between the shaft 3.3 and San Giovanni station, two tunnels have been excavated for a length of about 140m following a three step procedure: excavation of two small diameter tunnels with a mini TBM; soil improvement via low-pressure cement grouting; and conventional excavation of the two line tunnels in the improved soil. The tunnels, excavated at a depth of about 25 m, reach San Giovanni station passing at a short distance from the ancient AurelianWalls. This paper presents the displacement measured at ground surface during the construction activities, showing the efficiency of a protective barrier made by a line of piles in reducing the movements induced by tunnelling in the AurelianWalls.

Safeguarding of the AurelianWalls at Porta Asinaria from conventional tunnelling / Rampello, S.; Masini, L.. - (2022), pp. 292-309. (Intervento presentato al convegno THIRD INTERNATIONAL ISSMGE TC301 SYMPOSIUM, NAPOLI, ITALY, 22–24 JUNE 2022 tenutosi a Napoli) [10.1201/9781003308867-17].

Safeguarding of the AurelianWalls at Porta Asinaria from conventional tunnelling

S. Rampello
Writing – Original Draft Preparation
;
L. Masini
Data Curation
2022

Abstract

Construction of the line C of Rome underground is being carried out in a complex context due to the presence of archaeological artefacts, historical buildings and monuments of invaluable value. Along the contract T3 of the line, between the shaft 3.3 and San Giovanni station, two tunnels have been excavated for a length of about 140m following a three step procedure: excavation of two small diameter tunnels with a mini TBM; soil improvement via low-pressure cement grouting; and conventional excavation of the two line tunnels in the improved soil. The tunnels, excavated at a depth of about 25 m, reach San Giovanni station passing at a short distance from the ancient AurelianWalls. This paper presents the displacement measured at ground surface during the construction activities, showing the efficiency of a protective barrier made by a line of piles in reducing the movements induced by tunnelling in the AurelianWalls.
2022
THIRD INTERNATIONAL ISSMGE TC301 SYMPOSIUM, NAPOLI, ITALY, 22–24 JUNE 2022
tunnelling, protective intervention, monitoring, historical monuments
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Safeguarding of the AurelianWalls at Porta Asinaria from conventional tunnelling / Rampello, S.; Masini, L.. - (2022), pp. 292-309. (Intervento presentato al convegno THIRD INTERNATIONAL ISSMGE TC301 SYMPOSIUM, NAPOLI, ITALY, 22–24 JUNE 2022 tenutosi a Napoli) [10.1201/9781003308867-17].
File allegati a questo prodotto
File Dimensione Formato  
Rampello_Safeguarding_2022.pdf

accesso aperto

Tipologia: Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza: Creative commons
Dimensione 1.76 MB
Formato Adobe PDF
1.76 MB Adobe PDF

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/1640259
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact