Łe Superfund site “Naples Bagnoli Coroglio”, identified through the Law 388/2000(financiallawof2001), islocated in the western part of the city of Naples. It has been initially designed through M.D. 31/8/2001 (subsequently modified by the M.D. 08/08/2014). Łe site shows a total area of about 250 hectares and diRerent industrial facilities, including the Eternit asbestos cement production plants. Łe article contains a historical ex- cursus of both administrative and op- erational iter, in the framework of the main remediation activities carried out in the Eternit area of the Superfund. In particular, the characterization and the history of the site have been reported, with reference to the areas, the changes of companies and the subsequent activi- ties of site assessment and remediation. Specifically, the remediation has been carried out through separate and successive steps, as follows: 1) Evaluation of the structures and the subsoil through various analysis and cores; 2) Removal of above-ground facilities (building and industrial buildings), sewage networks and sub-services; 3) Reclamation of some areas contami- nated by Asbestos Containing Waste (ACW) and processing waste; 4) Remediation of the remaining lots of contaminated land. Łe present work focuses on the reme- diation techniques used and the preven- tion/safety measures envisaged for both workers and environment. Łe National Institute for Assurance against Accidents at Work (INAIL) was involved especially in the last remediation phase. INAIL issued three technical-scien- tific reports with the aim of improving the safety aspects related to workers and environment. In fact, the Institute plays an important consulting role on behalf of all the public administrations - among which, relating to Bagnoli Superfund, the Extraordinary Commissioner of Government, Environmental Minister and Local Authorities. It also takes part in technical meetings, carrying out on- site surveys and drawing up appropriate reference documents at national scale.
Le misure di sicurezza adottate a tutela dei lavoratori e della popolazione residente nel corso della bonifica del Sito di Interesse Nazionale di Bagnoli / Paglietti, Federica; Malinconico, Sergio; Conestabile della Staffa, Beatrice; Massaro, Crescenzo; Cecchetti, Gaetano; Dubini, Sergio; De Simone, Paolo. - In: GEOLOGIA DELL'AMBIENTE. - ISSN 1591-5352. - supplemento al n.2/2019(2019), pp. 313-319.
Le misure di sicurezza adottate a tutela dei lavoratori e della popolazione residente nel corso della bonifica del Sito di Interesse Nazionale di Bagnoli
Conestabile della staffa Beatrice;Massaro Crescenzo;
2019
Abstract
Łe Superfund site “Naples Bagnoli Coroglio”, identified through the Law 388/2000(financiallawof2001), islocated in the western part of the city of Naples. It has been initially designed through M.D. 31/8/2001 (subsequently modified by the M.D. 08/08/2014). Łe site shows a total area of about 250 hectares and diRerent industrial facilities, including the Eternit asbestos cement production plants. Łe article contains a historical ex- cursus of both administrative and op- erational iter, in the framework of the main remediation activities carried out in the Eternit area of the Superfund. In particular, the characterization and the history of the site have been reported, with reference to the areas, the changes of companies and the subsequent activi- ties of site assessment and remediation. Specifically, the remediation has been carried out through separate and successive steps, as follows: 1) Evaluation of the structures and the subsoil through various analysis and cores; 2) Removal of above-ground facilities (building and industrial buildings), sewage networks and sub-services; 3) Reclamation of some areas contami- nated by Asbestos Containing Waste (ACW) and processing waste; 4) Remediation of the remaining lots of contaminated land. Łe present work focuses on the reme- diation techniques used and the preven- tion/safety measures envisaged for both workers and environment. Łe National Institute for Assurance against Accidents at Work (INAIL) was involved especially in the last remediation phase. INAIL issued three technical-scien- tific reports with the aim of improving the safety aspects related to workers and environment. In fact, the Institute plays an important consulting role on behalf of all the public administrations - among which, relating to Bagnoli Superfund, the Extraordinary Commissioner of Government, Environmental Minister and Local Authorities. It also takes part in technical meetings, carrying out on- site surveys and drawing up appropriate reference documents at national scale.File | Dimensione | Formato | |
---|---|---|---|
Paglietti_misure-sicurezza-adottate_2019.pdf
accesso aperto
Tipologia:
Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
558.59 kB
Formato
Adobe PDF
|
558.59 kB | Adobe PDF |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.