he building of the new Napoli Afragola station stands on a 30,000-square-metre area around which ancillary structures are arranged. Its form is that of a bridge over the tracks, connecting two portions of land separated by the railroad. Construction began in March 2015 under the Astaldi company, a leading builder of railway structures and one of the most important contractors worldwide. It organised the particularly complex work with the ambitious aim of completing the station within the time frame established in the contract: 25 months. The station was delivered on the dot, and inaugurated on 6 June 2017
Il corpo edilizio della nuova stazione di Napoli Afragola, concentrato su un’area di 30.000 metri quadrati intorno alla quale si attestano le strutture sussidiarie, è plasmato come un ponte che scavalca i binari e connette due porzioni di territorio separate dalla ferrovia. Il cantiere, avviato nel marzo 2015, è stato affidato all’ATI Astaldi-NBI che, leader nelle costruzioni ferroviarie e tra i più importanti contractor mondiali, ha organizzato i lavori – particolarmente complessi – con l’ambizioso obiettivo di realizzare l’opera nei tempi prescritti dal contratto: 25 mesi. Puntualmente, la stazione è stata inaugurata il 6 giugno 2017. Il testo indaga la struttura e la costruzione dell'opera.
Il cantiere/The construction site. La costruzione diventa paesaggio/Construction as landscape / Marandola, Marzia. - In: DOMUS. - ISSN 0012-5377. - STAMPA. - n. 1015(2017), pp. 18-27.
Il cantiere/The construction site. La costruzione diventa paesaggio/Construction as landscape
MARANDOLA, MARZIA
2017
Abstract
he building of the new Napoli Afragola station stands on a 30,000-square-metre area around which ancillary structures are arranged. Its form is that of a bridge over the tracks, connecting two portions of land separated by the railroad. Construction began in March 2015 under the Astaldi company, a leading builder of railway structures and one of the most important contractors worldwide. It organised the particularly complex work with the ambitious aim of completing the station within the time frame established in the contract: 25 months. The station was delivered on the dot, and inaugurated on 6 June 2017File | Dimensione | Formato | |
---|---|---|---|
Marandola_Cantiere_2017.pdf
solo gestori archivio
Note: Articolo pubblicato
Tipologia:
Documento in Post-print (versione successiva alla peer review e accettata per la pubblicazione)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
1.19 MB
Formato
Adobe PDF
|
1.19 MB | Adobe PDF | Contatta l'autore |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.