The advanced source of Gamma-ray photons to be built in Bucharest (Romania), as part of the ELI-NP European Research Infrastructure, will generate photons by Compton back-scattering in the collision between a multi-bunch electron beam and a high intensity recirculated laser pulse. An S-Band photoinjector and the following C-band Linac at a maximum energy of 720MeV, under construction by an European consortium (EurogammaS) led by INFN, will operate at 100Hz repetition rate with trains of 32 electron bunches, separated by 16ns and a 250pC nominal charge. The different BPMs and current transformers used to measure transverse beam position and charge along the LINAC are described. Design criteria, production status and bench test results of the charge and position pickups are reported in the paper, together with the related data acquisition systems.
Beam diagnostics for charge and position measurements in ELI-NP GBS / Franzini, G.; Cioeta, Fara; Coiro, O.; Pellegrini, D.; A., Stella; M., Serio; Variola, A.; Mostacci, Andrea; Tocci, S.. - ELETTRONICO. - (2016), pp. 682-685. (Intervento presentato al convegno IBIC 2016 tenutosi a Barcelona, Spain nel 7-9 Settembre 2016) [10.18429/JACoW-IBIC2016-WEPG25].
Beam diagnostics for charge and position measurements in ELI-NP GBS
Franzini, G.;CIOETA, Fara;MOSTACCI, Andrea;
2016
Abstract
The advanced source of Gamma-ray photons to be built in Bucharest (Romania), as part of the ELI-NP European Research Infrastructure, will generate photons by Compton back-scattering in the collision between a multi-bunch electron beam and a high intensity recirculated laser pulse. An S-Band photoinjector and the following C-band Linac at a maximum energy of 720MeV, under construction by an European consortium (EurogammaS) led by INFN, will operate at 100Hz repetition rate with trains of 32 electron bunches, separated by 16ns and a 250pC nominal charge. The different BPMs and current transformers used to measure transverse beam position and charge along the LINAC are described. Design criteria, production status and bench test results of the charge and position pickups are reported in the paper, together with the related data acquisition systems.File | Dimensione | Formato | |
---|---|---|---|
Franzini_beam_2016.pdf
accesso aperto
Tipologia:
Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza:
Creative commons
Dimensione
868.15 kB
Formato
Adobe PDF
|
868.15 kB | Adobe PDF |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.