This study presents a cost comparison between commercially available high-voltage DC (HVDC) and extra high-voltage AC shore connection (±320 kV voltage source converter and 420 kV-50 Hz single-core and three-core cables), for a 1 GW offshore wind farm cluster, considering transmission distances up to 400 km. The HVDC system is a point-to-point connection whereas multiple AC intermediate compensating stations are envisaged for AC when needed. Capital costs are evaluated from recently awarded contracts, operating costs include energy losses and missed revenues due to transmission system unavailability, both estimated using North Sea wind production curves. Optimal AC intermediate compensation, if any, and reactive profiles are also taken into account. Resultsshow that HVDC has lower transmission losses at distances in excess of 130 km; however, due to the combined effect of lower AC capital cost and unavailability, using three-core aluminium cables can be more convenient up to 360 km distance.

Very long distance connection of gigawatt size offshore wind farms: extra high-voltage ac versus high-voltage dc cost comparison / Lauria, Stefano; Schembari, Maddalena; Palone, Francesco; Maccioni, Marco. - In: IET RENEWABLE POWER GENERATION. - ISSN 1752-1416. - STAMPA. - 10:5(2016), pp. 713-720. [10.1049/iet-rpg.2015.0348]

Very long distance connection of gigawatt size offshore wind farms: extra high-voltage ac versus high-voltage dc cost comparison

LAURIA, Stefano;MACCIONI, Marco
2016

Abstract

This study presents a cost comparison between commercially available high-voltage DC (HVDC) and extra high-voltage AC shore connection (±320 kV voltage source converter and 420 kV-50 Hz single-core and three-core cables), for a 1 GW offshore wind farm cluster, considering transmission distances up to 400 km. The HVDC system is a point-to-point connection whereas multiple AC intermediate compensating stations are envisaged for AC when needed. Capital costs are evaluated from recently awarded contracts, operating costs include energy losses and missed revenues due to transmission system unavailability, both estimated using North Sea wind production curves. Optimal AC intermediate compensation, if any, and reactive profiles are also taken into account. Resultsshow that HVDC has lower transmission losses at distances in excess of 130 km; however, due to the combined effect of lower AC capital cost and unavailability, using three-core aluminium cables can be more convenient up to 360 km distance.
2016
HVDC power transmission; cost reduction; offshore installations; power cables; wind power plants
01 Pubblicazione su rivista::01a Articolo in rivista
Very long distance connection of gigawatt size offshore wind farms: extra high-voltage ac versus high-voltage dc cost comparison / Lauria, Stefano; Schembari, Maddalena; Palone, Francesco; Maccioni, Marco. - In: IET RENEWABLE POWER GENERATION. - ISSN 1752-1416. - STAMPA. - 10:5(2016), pp. 713-720. [10.1049/iet-rpg.2015.0348]
File allegati a questo prodotto
File Dimensione Formato  
Lauria_postprint_Very_2016.pdf

accesso aperto

Tipologia: Documento in Post-print (versione successiva alla peer review e accettata per la pubblicazione)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 1.32 MB
Formato Adobe PDF
1.32 MB Adobe PDF
Lauria_Very_2016.pdf

accesso aperto

Tipologia: Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 289.01 kB
Formato Adobe PDF
289.01 kB Adobe PDF

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/870666
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 36
  • ???jsp.display-item.citation.isi??? 23
social impact