Systems in many safety-critical application domains are subject to certification requirements. For any given system, however, it may be the case that only a subset of its functionality is safety-critical and hence subject to certification, the rest of the functionality is non safety critical and does not need to be certified, or is certified to a lower level of assurance. An algorithm called EDF-VD (for Earliest Deadline First with Virtual Deadlines) is described for the scheduling of such mixed-criticality task systems. Analyses of EDF-VD significantly superior to previously-known ones are presented, based on metrics such as processor speedup factor (EDF-VD is proved to be optimal with respect to this metric) and utilization bounds. © 2012 IEEE.
The preemptive uniprocessor scheduling of mixed-criticality implicit-deadline sporadic task systems / S., Baruah; Bonifaci, Vincenzo; G., Dangelo; H., Li; MARCHETTI SPACCAMELA, Alberto; S., Van Der Ster; L., Stougie. - STAMPA. - (2012), pp. 145-154. (Intervento presentato al convegno 24th Euromicro Conference on Real-Time Systems, ECRTS 2012 tenutosi a Pisa nel 10 July 2012 through 13 July 2012) [10.1109/ecrts.2012.42].
The preemptive uniprocessor scheduling of mixed-criticality implicit-deadline sporadic task systems
BONIFACI, VINCENZO;MARCHETTI SPACCAMELA, Alberto;
2012
Abstract
Systems in many safety-critical application domains are subject to certification requirements. For any given system, however, it may be the case that only a subset of its functionality is safety-critical and hence subject to certification, the rest of the functionality is non safety critical and does not need to be certified, or is certified to a lower level of assurance. An algorithm called EDF-VD (for Earliest Deadline First with Virtual Deadlines) is described for the scheduling of such mixed-criticality task systems. Analyses of EDF-VD significantly superior to previously-known ones are presented, based on metrics such as processor speedup factor (EDF-VD is proved to be optimal with respect to this metric) and utilization bounds. © 2012 IEEE.File | Dimensione | Formato | |
---|---|---|---|
VE_2012_11573-660041.pdf
solo gestori archivio
Tipologia:
Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
335.38 kB
Formato
Adobe PDF
|
335.38 kB | Adobe PDF | Contatta l'autore |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.