In electrical power systems, such as data centers and hospitals, where service continuity is essential, the electrical operation management must be organized and it is necessary to have an emergency response team available at all times (24/7). In hospitals, for instance, doctors, surgeons, administrators, medical devices are rightly at the forefront, but electrical and technological systems and team of technicians are wrongly considered as ancillaries. The paper emphasizes the importance of the Business Continuity Management (BCM) and highlights how IT-M systems have not to carry out power outage for fault both due to overcurrent and also due to overvoltage. When a fault occurs during a surgical operation, the protection system shall include a count-down time so that emergency response team must solve the problem before the system collapses.

In electrical power systems, such as data centers and hospitals, where service continuity is essential, the electrical operation management must be organized and it is necessary to have an emergency response team available at all times (24/7). In hospitals, for instance, doctors, surgeons, administrators, medical devices are rightly at the forefront, but electrical and technological systems and team of technicians are wrongly considered as ancillaries. The paper emphasizes the importance of the Business Continuity Management (BCM) and highlights how IT-M systems have not to carry out power outage for fault both due to overcurrent and also due to overvoltage. When a fault occurs during a surgical operation, the protection system shall include a count-down time so that emergency response team must solve the problem before the system collapses.

Safety system with harmless first fault: complete & medical IT-system / Parise, Giuseppe; C., Mazzetti; Parise, Luigi; F., Fiamingo. - ELETTRONICO. - (2014), pp. 1-6. (Intervento presentato al convegno IEEE IAS Annual meeting 2014 tenutosi a Vancouver, Canada nel 5-9 October 2014) [10.1109/IAS.2014.6978479].

Safety system with harmless first fault: complete & medical IT-system

PARISE, Giuseppe;PARISE, LUIGI;
2014

Abstract

In electrical power systems, such as data centers and hospitals, where service continuity is essential, the electrical operation management must be organized and it is necessary to have an emergency response team available at all times (24/7). In hospitals, for instance, doctors, surgeons, administrators, medical devices are rightly at the forefront, but electrical and technological systems and team of technicians are wrongly considered as ancillaries. The paper emphasizes the importance of the Business Continuity Management (BCM) and highlights how IT-M systems have not to carry out power outage for fault both due to overcurrent and also due to overvoltage. When a fault occurs during a surgical operation, the protection system shall include a count-down time so that emergency response team must solve the problem before the system collapses.
2014
IEEE IAS Annual meeting 2014
In electrical power systems, such as data centers and hospitals, where service continuity is essential, the electrical operation management must be organized and it is necessary to have an emergency response team available at all times (24/7). In hospitals, for instance, doctors, surgeons, administrators, medical devices are rightly at the forefront, but electrical and technological systems and team of technicians are wrongly considered as ancillaries. The paper emphasizes the importance of the Business Continuity Management (BCM) and highlights how IT-M systems have not to carry out power outage for fault both due to overcurrent and also due to overvoltage. When a fault occurs during a surgical operation, the protection system shall include a count-down time so that emergency response team must solve the problem before the system collapses.
safety, IT-system, equipment under control, Business Continuity Management, overvoltage, insulation device, human competence
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Safety system with harmless first fault: complete & medical IT-system / Parise, Giuseppe; C., Mazzetti; Parise, Luigi; F., Fiamingo. - ELETTRONICO. - (2014), pp. 1-6. (Intervento presentato al convegno IEEE IAS Annual meeting 2014 tenutosi a Vancouver, Canada nel 5-9 October 2014) [10.1109/IAS.2014.6978479].
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/567735
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? ND
social impact