Ten small rock slides (with a volume ranging from 101 to 103 m3) on a slope affected by working activities were detected, located, and timed using pictures collected by an automatic camera during 40 months of continuous monitoring with terrestrial SAR interferometry (TInSAR). These landslides were analyzed in detail by examining their pre-failure time series of displacement inferred from high-sampling frequency (approximately 5 min) TInSAR monitoring. In most of these cases, a typical creep behavior was observed with the displacement starting 370 to 12 h before the collapse. Additionally, an evident acceleration decrease of the displacement a few hours before the failure was observed in some rock/debris slides, thus suggesting the possibility of a mechanical feature of the slope that differs from the classical creep theory. The efficacy of the linear Fukuzono approach for the prediction of time of failure was tested by back-analyzing the ten landslides. Furthermore, a modified Fukuzono approach named average data Fukuzono (ADF) was implemented and applied to our dataset. Such an approach is able to improve forecasting effectiveness by reducing the error due to anomalies in the time series of displacement, like the acceleration decrease before failure. A prediction with a temporal accuracy of at least 2 h was obtained for all the analyzed rock/debris slides. © 2014 The Author(s).

New insights into the temporal prediction of landslides by a terrestrial SAR interferometry monitoring case study / Mazzanti, Paolo; Bozzano, Francesca; Cipriani, Ivan; Prestininzi, Alberto. - In: LANDSLIDES. - ISSN 1612-510X. - STAMPA. - (2014). [10.1007/s10346-014-0469-x]

New insights into the temporal prediction of landslides by a terrestrial SAR interferometry monitoring case study

MAZZANTI, PAOLO;BOZZANO, Francesca;CIPRIANI, IVAN;PRESTININZI, ALBERTO
2014

Abstract

Ten small rock slides (with a volume ranging from 101 to 103 m3) on a slope affected by working activities were detected, located, and timed using pictures collected by an automatic camera during 40 months of continuous monitoring with terrestrial SAR interferometry (TInSAR). These landslides were analyzed in detail by examining their pre-failure time series of displacement inferred from high-sampling frequency (approximately 5 min) TInSAR monitoring. In most of these cases, a typical creep behavior was observed with the displacement starting 370 to 12 h before the collapse. Additionally, an evident acceleration decrease of the displacement a few hours before the failure was observed in some rock/debris slides, thus suggesting the possibility of a mechanical feature of the slope that differs from the classical creep theory. The efficacy of the linear Fukuzono approach for the prediction of time of failure was tested by back-analyzing the ten landslides. Furthermore, a modified Fukuzono approach named average data Fukuzono (ADF) was implemented and applied to our dataset. Such an approach is able to improve forecasting effectiveness by reducing the error due to anomalies in the time series of displacement, like the acceleration decrease before failure. A prediction with a temporal accuracy of at least 2 h was obtained for all the analyzed rock/debris slides. © 2014 The Author(s).
2014
failure; terrestrial sar interferometry; landslide forecasting; average data fukuzono; displacement time series
01 Pubblicazione su rivista::01a Articolo in rivista
New insights into the temporal prediction of landslides by a terrestrial SAR interferometry monitoring case study / Mazzanti, Paolo; Bozzano, Francesca; Cipriani, Ivan; Prestininzi, Alberto. - In: LANDSLIDES. - ISSN 1612-510X. - STAMPA. - (2014). [10.1007/s10346-014-0469-x]
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/543118
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 63
  • ???jsp.display-item.citation.isi??? 58
social impact