The paper illustrates the results of a research carried out in the outsourced service sector of Facility Management (FM). The objective of the research was to develop a new management model for FM able to enhance the business process performance. The case study of Azienda Servizi Sanitari 1 (ASS1), a medical service authority, and of the ATI, a temporary joint enterprise which provides non-core services to ASS1 highlights a discrepancy between the level of service perceived and provided. The research focused on the in-depth analysis of the application of a performance measurement system in the FM. The authors propose the introduction of a Performance Measurement System (PMS), which shares some indicators between the FM service provider and customer in a so-called Global Service (GS) contract. The proposed PMS is an integration of the Balanced Scorecard (BSC) and Service BSC (SBC) suited for the Facility Management service industry.

A performance measurement system for facility management: the case study of a medical service authority / De Toni, A. F.; Fornasier, A.; Montagner, M.; Nonino, Fabio. - 2:(2006), pp. 1045-1054. (Intervento presentato al convegno 13th International EurOMA Conference tenutosi a Glasgow nel 2006).

A performance measurement system for facility management: the case study of a medical service authority

NONINO, FABIO
2006

Abstract

The paper illustrates the results of a research carried out in the outsourced service sector of Facility Management (FM). The objective of the research was to develop a new management model for FM able to enhance the business process performance. The case study of Azienda Servizi Sanitari 1 (ASS1), a medical service authority, and of the ATI, a temporary joint enterprise which provides non-core services to ASS1 highlights a discrepancy between the level of service perceived and provided. The research focused on the in-depth analysis of the application of a performance measurement system in the FM. The authors propose the introduction of a Performance Measurement System (PMS), which shares some indicators between the FM service provider and customer in a so-called Global Service (GS) contract. The proposed PMS is an integration of the Balanced Scorecard (BSC) and Service BSC (SBC) suited for the Facility Management service industry.
2006
13th International EurOMA Conference
Performance Measurement System; Facility Management; Case Study
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
A performance measurement system for facility management: the case study of a medical service authority / De Toni, A. F.; Fornasier, A.; Montagner, M.; Nonino, Fabio. - 2:(2006), pp. 1045-1054. (Intervento presentato al convegno 13th International EurOMA Conference tenutosi a Glasgow nel 2006).
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/536871
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact