The paper presents the AeroTRAIN project in railway aerodynamics, the objectives and some first results. The project is promoting interoperable rail traffic by addressing identified needs in rolling stock authorisation, mainly focusing on the technical specifications for interoperability. The areas addressed are: open air pressure pulses, aerodynamic loads on track (ballast pick-up), crosswinds, train-tunnel interaction (loads on conventional trains and micro-pressure wave phenomena) and slipstream effects. The work contains full-scale and model-scale tests as well as numerical simulations. Complementing the area specific research is work focusing on regulatory acceptance by emphasising a scientific assessment of uncertainties and ensuring that the safety, effectiveness, efficiency and feasibility of the proposed conformity assessment processes are convincing.

Presentation of the EU FP7 AeroTRAIN project and first results / M., Sima; E., Grappein; M., Weise; N., Paradot; M., Hieke; C., Baker; Licciardello, Riccardo; M., Couturier. - ELETTRONICO. - (2011), pp. ...-.... (Intervento presentato al convegno WCRR 2011 World Congress on Railway Research tenutosi a Lille, France nel maggio 2011).

Presentation of the EU FP7 AeroTRAIN project and first results

LICCIARDELLO, Riccardo;
2011

Abstract

The paper presents the AeroTRAIN project in railway aerodynamics, the objectives and some first results. The project is promoting interoperable rail traffic by addressing identified needs in rolling stock authorisation, mainly focusing on the technical specifications for interoperability. The areas addressed are: open air pressure pulses, aerodynamic loads on track (ballast pick-up), crosswinds, train-tunnel interaction (loads on conventional trains and micro-pressure wave phenomena) and slipstream effects. The work contains full-scale and model-scale tests as well as numerical simulations. Complementing the area specific research is work focusing on regulatory acceptance by emphasising a scientific assessment of uncertainties and ensuring that the safety, effectiveness, efficiency and feasibility of the proposed conformity assessment processes are convincing.
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/509900
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact