In the operation of electrical installations risk assessment evaluates hazards and conflicts. A kinematics analogy for analyzing risk of “collisions” offers a new approach for operational procedures and allows introduction of a “transitions” theory for intersections. The architecture of electrical installations can be configured in increasing complexity related to its exigencies, taking actions on the sources and on the configuration. Analogies between the operation of highway intersections of multiple traffic lanes and the operation of nodes of electrical power systems are proposed as offering an equivalent well-known way for examining constraints in the transitions, for facilitating the understanding of the mathematical description and suggesting new approaches and new methodologies for solutions. The paper describes the special configuration of the node “double two”, constituted by two automatic transfer systems (ATS's) connectible in parallel.

Transitions theory in operation of electrical installations / Parise, Giuseppe; E., Hesla; Parise, Luigi. - STAMPA. - (2012). (Intervento presentato al convegno 48th IEEE Industrial & Commercial Power Systems Conference. tenutosi a Louisville, KY nel 20-24 May 2012) [10.1109/icps.2012.6229609].

Transitions theory in operation of electrical installations

PARISE, Giuseppe;PARISE, LUIGI
2012

Abstract

In the operation of electrical installations risk assessment evaluates hazards and conflicts. A kinematics analogy for analyzing risk of “collisions” offers a new approach for operational procedures and allows introduction of a “transitions” theory for intersections. The architecture of electrical installations can be configured in increasing complexity related to its exigencies, taking actions on the sources and on the configuration. Analogies between the operation of highway intersections of multiple traffic lanes and the operation of nodes of electrical power systems are proposed as offering an equivalent well-known way for examining constraints in the transitions, for facilitating the understanding of the mathematical description and suggesting new approaches and new methodologies for solutions. The paper describes the special configuration of the node “double two”, constituted by two automatic transfer systems (ATS's) connectible in parallel.
2012
48th IEEE Industrial & Commercial Power Systems Conference.
critical loads; electrical transitions; automatic transfer systems; business and service continuity; switching and operational procedures
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Transitions theory in operation of electrical installations / Parise, Giuseppe; E., Hesla; Parise, Luigi. - STAMPA. - (2012). (Intervento presentato al convegno 48th IEEE Industrial & Commercial Power Systems Conference. tenutosi a Louisville, KY nel 20-24 May 2012) [10.1109/icps.2012.6229609].
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/509462
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 6
  • ???jsp.display-item.citation.isi??? 0
social impact