We study scheduling problems with multiple modes and dedicated resources arising in production and project management, which constitute a special class of the general multimode resource-constrained project scheduling problem. A task may require simultaneously a set of discrete, renewable resources to be processed and the processing can be performed in different modes, that is with different resource sets, processing times, or costs. Precedence constraints can exist among tasks. The total budget that can be allocated to the project can be limited. The problem consists of identifying a mode for each task and a starting time for its processing respecting precedence, resource, and budget constraints. A graph model and an iterative solution scheme are presented. Specific heuristic algorithms for the cases with and without budget constraints are given and computational results are discussed

Heuristics for Multimode Scheduling Problems with Dedicated Resources / Bianco, L.; Dell'Olmo, Paolo; Speranza, M. G.. - In: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. - ISSN 0377-2217. - STAMPA. - 107:(1998), pp. 260-271.

Heuristics for Multimode Scheduling Problems with Dedicated Resources

DELL'OLMO, Paolo;
1998

Abstract

We study scheduling problems with multiple modes and dedicated resources arising in production and project management, which constitute a special class of the general multimode resource-constrained project scheduling problem. A task may require simultaneously a set of discrete, renewable resources to be processed and the processing can be performed in different modes, that is with different resource sets, processing times, or costs. Precedence constraints can exist among tasks. The total budget that can be allocated to the project can be limited. The problem consists of identifying a mode for each task and a starting time for its processing respecting precedence, resource, and budget constraints. A graph model and an iterative solution scheme are presented. Specific heuristic algorithms for the cases with and without budget constraints are given and computational results are discussed
1998
heuristic algorithms; TASK SCHEDULING
01 Pubblicazione su rivista::01a Articolo in rivista
Heuristics for Multimode Scheduling Problems with Dedicated Resources / Bianco, L.; Dell'Olmo, Paolo; Speranza, M. G.. - In: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. - ISSN 0377-2217. - STAMPA. - 107:(1998), pp. 260-271.
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/48630
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 23
  • ???jsp.display-item.citation.isi??? 24
social impact