The Italian Garigliano Nuclear Power Plant (NPP) started its energy production in 1963. At present it is in the decommissioning stage. In order to get a proper management of the radioactive waste that will be produced during the dismantling operations it has been considered convenient to convert the turbine building of the plant into a temporary waste repository. This decision posed a remarkable seismic safety assessment issue. As a matter of fact, the challenge was to extend, in satisfactory safety conditions, the use of an important facility that has reached the end of its designed lifetime and to have this extended use approved by nuclear safety agencies. In this context many tasks have been accomplished, of which the most important are: (a) a new appraisal of site seismic hazard; (b) the execution of many investigations and testing on the construction materials; (c) the set up of a detailed 3D finite element model including the explicit representation of foundation piles and soil; (d) consideration of soil structure kinematic and dynamic nteraction effects. This paper describes the adopted seismic safety assessment criteria which are based on a performance objectives design approach. While performance based design is the approach currently recommended by European Regulations to manage seismic risk and it is fully incorporated in the Italian code for conventional buildings, bridges and plants, NPP are not explicitly considered. Therefore it was necessary to delineate a consistent interpretation of prescribed rules in order to properly select the maximum and operating design earthquakes on one side and corresponding acceptable limit states on the other side. The paper further provides an outline of the numerical analyses carried out, of the main results obtained and of the principal retrofitting actions that will be realized.

Garigliano nuclear power plant: seismic evaluation of the turbine building / Gramiccia, Luciano; P., Palumbo; S., Cardellicchio; E., Faccioli; M., Villani. - ELETTRONICO. - 120:(2011), pp. 207-223. (Intervento presentato al convegno 8th International Conference on Earthquake Resistant Engineering Structures tenutosi a CHIANCIANO TERME, Italy nel 7 - 9 September 2011) [10.2495/ERES110181].

Garigliano nuclear power plant: seismic evaluation of the turbine building

GRAMICCIA, Luciano;
2011

Abstract

The Italian Garigliano Nuclear Power Plant (NPP) started its energy production in 1963. At present it is in the decommissioning stage. In order to get a proper management of the radioactive waste that will be produced during the dismantling operations it has been considered convenient to convert the turbine building of the plant into a temporary waste repository. This decision posed a remarkable seismic safety assessment issue. As a matter of fact, the challenge was to extend, in satisfactory safety conditions, the use of an important facility that has reached the end of its designed lifetime and to have this extended use approved by nuclear safety agencies. In this context many tasks have been accomplished, of which the most important are: (a) a new appraisal of site seismic hazard; (b) the execution of many investigations and testing on the construction materials; (c) the set up of a detailed 3D finite element model including the explicit representation of foundation piles and soil; (d) consideration of soil structure kinematic and dynamic nteraction effects. This paper describes the adopted seismic safety assessment criteria which are based on a performance objectives design approach. While performance based design is the approach currently recommended by European Regulations to manage seismic risk and it is fully incorporated in the Italian code for conventional buildings, bridges and plants, NPP are not explicitly considered. Therefore it was necessary to delineate a consistent interpretation of prescribed rules in order to properly select the maximum and operating design earthquakes on one side and corresponding acceptable limit states on the other side. The paper further provides an outline of the numerical analyses carried out, of the main results obtained and of the principal retrofitting actions that will be realized.
2011
8th International Conference on Earthquake Resistant Engineering Structures
nuclear power plant; radioactive waste; seismic hazards; repository; existing structures
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Garigliano nuclear power plant: seismic evaluation of the turbine building / Gramiccia, Luciano; P., Palumbo; S., Cardellicchio; E., Faccioli; M., Villani. - ELETTRONICO. - 120:(2011), pp. 207-223. (Intervento presentato al convegno 8th International Conference on Earthquake Resistant Engineering Structures tenutosi a CHIANCIANO TERME, Italy nel 7 - 9 September 2011) [10.2495/ERES110181].
File allegati a questo prodotto
File Dimensione Formato  
Palumbo_Garigliano_2011.pdf

accesso aperto

Tipologia: Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 1.59 MB
Formato Adobe PDF
1.59 MB Adobe PDF

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/428245
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 2
  • ???jsp.display-item.citation.isi??? ND
social impact