The paper illustrates the characteristics and operating modes of the emergency traction power supply system implemented on the Bologna - Florence line of the Italian High Speed network which is electrified at 2x25kV, 50Hz. The paper first describes the main characteristics of the equipment installed, the design criteria and power supply scheme. The paper goes on to outline the challenges of power quality associated with the connection of a heavy single phase load to the Medium Voltage (MV) network. The effectiveness of the installation and the evaluation of voltage unbalance compatibility levels compliance are then presented. ©2010 IEEE.

Bologna - Florence high speed railway line: MV emergency traction power supply, operating conditions and PQ issues / Capasso, Alfonso; G., Ghilardi; G., Guidi Buffarini. - STAMPA. - (2010), pp. 1-5. (Intervento presentato al convegno International Conference on Electrical Systems for Aircraft, Railway and Ship Propulsion, ESARS 2010 tenutosi a Bologna nel 19 October 2010 through 21 October 2010) [10.1109/esars.2010.5665197].

Bologna - Florence high speed railway line: MV emergency traction power supply, operating conditions and PQ issues

CAPASSO, Alfonso;
2010

Abstract

The paper illustrates the characteristics and operating modes of the emergency traction power supply system implemented on the Bologna - Florence line of the Italian High Speed network which is electrified at 2x25kV, 50Hz. The paper first describes the main characteristics of the equipment installed, the design criteria and power supply scheme. The paper goes on to outline the challenges of power quality associated with the connection of a heavy single phase load to the Medium Voltage (MV) network. The effectiveness of the installation and the evaluation of voltage unbalance compatibility levels compliance are then presented. ©2010 IEEE.
2010
International Conference on Electrical Systems for Aircraft, Railway and Ship Propulsion, ESARS 2010
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Bologna - Florence high speed railway line: MV emergency traction power supply, operating conditions and PQ issues / Capasso, Alfonso; G., Ghilardi; G., Guidi Buffarini. - STAMPA. - (2010), pp. 1-5. (Intervento presentato al convegno International Conference on Electrical Systems for Aircraft, Railway and Ship Propulsion, ESARS 2010 tenutosi a Bologna nel 19 October 2010 through 21 October 2010) [10.1109/esars.2010.5665197].
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/386847
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 6
  • ???jsp.display-item.citation.isi??? ND
social impact