In general, power software lacks lockout/tagout procedures and transfer/switching procedures - both critical shortcomings. In 2008 this Working Group was created to develop methodology for software programs addressing operational procedures, switching procedures including lockout/tagout, and transfer procedures. The “User Guideline Specification” provides this methodology. Software itself will be developed by software vendors. Related was a goal to present a clear, simple, mathematical and graphical language to promote rigorous analysis and virtual verification of the applicable software; a unified suite for an operational, mathematical and graphical language. Referenced papers provide a sound basis for work toward achieving this goal, a task which the WG commends to future authors and Working Groups. Although it is outside the defined scope, the WG notes that these basic concepts apply to other energy systems. The WG encourages interested parties to develop similar approaches for other energy systems.

User Specifications For Operational And Switching Procedures aA Working Group Report / Hesla, E.; Brown, B.; Bor, T.; Clark, R.; Clemente, K.; Dai, J. J.; Davis, C. E.; Giese, B.; Hittel, M.; Kamo, L.; Korpess, D.; Mancilla, P.; Mitolo, M.; Mohla, D.; Mozina, C.; Padden, L.; Panetta, S.; Parise, Giuseppe; Pollock, M.; Rifaat, R.; Savosbianik, M.; Simon, M.; Worthington, S.. - In: IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS. - ISSN 0093-9994. - ELETTRONICO. - 48:1(2012), pp. 225-228. [10.1109/TIA.2011.2175880]

User Specifications For Operational And Switching Procedures aA Working Group Report

PARISE, Giuseppe;
2012

Abstract

In general, power software lacks lockout/tagout procedures and transfer/switching procedures - both critical shortcomings. In 2008 this Working Group was created to develop methodology for software programs addressing operational procedures, switching procedures including lockout/tagout, and transfer procedures. The “User Guideline Specification” provides this methodology. Software itself will be developed by software vendors. Related was a goal to present a clear, simple, mathematical and graphical language to promote rigorous analysis and virtual verification of the applicable software; a unified suite for an operational, mathematical and graphical language. Referenced papers provide a sound basis for work toward achieving this goal, a task which the WG commends to future authors and Working Groups. Although it is outside the defined scope, the WG notes that these basic concepts apply to other energy systems. The WG encourages interested parties to develop similar approaches for other energy systems.
2012
Lockout/tagout (LOTO); operating conditions; power system application software; safe work practices; switching procedures
01 Pubblicazione su rivista::01a Articolo in rivista
User Specifications For Operational And Switching Procedures aA Working Group Report / Hesla, E.; Brown, B.; Bor, T.; Clark, R.; Clemente, K.; Dai, J. J.; Davis, C. E.; Giese, B.; Hittel, M.; Kamo, L.; Korpess, D.; Mancilla, P.; Mitolo, M.; Mohla, D.; Mozina, C.; Padden, L.; Panetta, S.; Parise, Giuseppe; Pollock, M.; Rifaat, R.; Savosbianik, M.; Simon, M.; Worthington, S.. - In: IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS. - ISSN 0093-9994. - ELETTRONICO. - 48:1(2012), pp. 225-228. [10.1109/TIA.2011.2175880]
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/356422
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 7
  • ???jsp.display-item.citation.isi??? 6
social impact