The new high speed railway lines, under construction in Italy, are electrified in 2x25 kHz – 50 Hz and adopt a signaling system with audio frequency track circuits (AF-TC), ranging from 2.1 kHz to 16.5 kHz. On this type of TC preliminary studies of the compatibility are required in order to test their correct operation. To this aim a measurement campaign on the AF-TC of the new High Speed Railway System Rome-Naples has been made. From the measurement results and their post-elaboration, based on accuracy and uncertainty analysis, the AF- TC voltage profile has been drawn with some interesting consideration about the operation of the AF-TC, that are reported in the present paper.
A measurement campaign on audio frequency track circuits of high speed railway systems / Falvo, Maria Carmen; E., Fedeli; Lamedica, Regina. - STAMPA. - (2006), pp. 1115-1120. (Intervento presentato al convegno IEEE SPEEDAM 2006 - International Symposium on Power Electronics, Electrical Drives, Automation and Motion, 2006. tenutosi a Taormina - ITALIA nel 23-26 Maggio 2006) [10.1109/SPEEDAM.2006.1649935].
A measurement campaign on audio frequency track circuits of high speed railway systems
FALVO, Maria Carmen;LAMEDICA, Regina
2006
Abstract
The new high speed railway lines, under construction in Italy, are electrified in 2x25 kHz – 50 Hz and adopt a signaling system with audio frequency track circuits (AF-TC), ranging from 2.1 kHz to 16.5 kHz. On this type of TC preliminary studies of the compatibility are required in order to test their correct operation. To this aim a measurement campaign on the AF-TC of the new High Speed Railway System Rome-Naples has been made. From the measurement results and their post-elaboration, based on accuracy and uncertainty analysis, the AF- TC voltage profile has been drawn with some interesting consideration about the operation of the AF-TC, that are reported in the present paper.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.