The architecture of a power system can be configured in increasing complexity related to its exigencies, taking actions on the sources and on the configuration. In the failure cases, it has to guarantee availability and integrity, the time to repair the components has to be compatible to avoid the loss service continuity. The paper relates on the special configuration of the node "double two", constituted by two, and so more, automatic transfer systems connectible in parallel, and reports on the validation tests executed. The component systems are synchronized and conditioned to guarantee a complete redundancy or/and a more flexible operation. The innovation it is not only technological, but also of methodology and of architecture, the node 22 constitutes a sample of open systems, basilar for flexible architectures of high performances. © 2008 IEEE.

Architecture of electrical installations: The node double two / Parise, Giuseppe; Aldo, Gabelli; E., Berenato; D., Brambilla; L., Signorelli. - ELETTRONICO. - (2008), pp. 1-6. (Intervento presentato al convegno 2008 IEEE Industry Applications Society Annual Meeting, IAS'08 tenutosi a Edmonton, AB nel 5 October 2008 through 9 October 2008) [10.1109/08ias.2008.372].

Architecture of electrical installations: The node double two

PARISE, Giuseppe;
2008

Abstract

The architecture of a power system can be configured in increasing complexity related to its exigencies, taking actions on the sources and on the configuration. In the failure cases, it has to guarantee availability and integrity, the time to repair the components has to be compatible to avoid the loss service continuity. The paper relates on the special configuration of the node "double two", constituted by two, and so more, automatic transfer systems connectible in parallel, and reports on the validation tests executed. The component systems are synchronized and conditioned to guarantee a complete redundancy or/and a more flexible operation. The innovation it is not only technological, but also of methodology and of architecture, the node 22 constitutes a sample of open systems, basilar for flexible architectures of high performances. © 2008 IEEE.
2008
2008 IEEE Industry Applications Society Annual Meeting, IAS'08
automatic transfer systems; flexible architectures; open systems
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Architecture of electrical installations: The node double two / Parise, Giuseppe; Aldo, Gabelli; E., Berenato; D., Brambilla; L., Signorelli. - ELETTRONICO. - (2008), pp. 1-6. (Intervento presentato al convegno 2008 IEEE Industry Applications Society Annual Meeting, IAS'08 tenutosi a Edmonton, AB nel 5 October 2008 through 9 October 2008) [10.1109/08ias.2008.372].
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/175528
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 10
  • ???jsp.display-item.citation.isi??? 0
social impact