The interest in half-bridge Voltage Source Converters (VSCs) with HVDC circuit breakers is a solution to manage transient faults when the link is fully or partially made with an overhead line. The role of the HVDC circuit breaker becomes of paramount importance since to clear transient faults its ability to operate multi reclosures helps to increase the availability of the link. On the other hand, the arc current extinction time on the fault point along the line plays a not negligible role since this time has an impact on the reclosure of the line. Unfortunately, very little can be found in the scientific literature about HVDC breakers. For such reason, in this paper with the aim to study the fault current transients and the stresses an intentionally simplified approach has been adopted with the goal to have a first access to the expected values. The estimation of the arc extinction time of transient pole-to-ground fault in overhead HVDC line, which impacts the minimum dead time for a successful reclosure, is in any case the main aim of this paper. This is a first and necessary step to understand if potential critical issues could be expected. A deeper analysis should be carried out once more details will be available about these technologies.
Assessment of arc current extinction time of transient faults in HVDC-VSC systems with hybrid DC breakers / De Maria, S.; Marzinotto, M.; Palone, F.; Patti, S.; Gatta, F. M.; Graziani, M.; Lauria, S.. - (2023), pp. 1-4. (Intervento presentato al convegno 2023 AEIT HVDC International Conference, AEIT HVDC 2023 tenutosi a Rome, Italy) [10.1109/aeithvdc58550.2023.10178997].
Assessment of arc current extinction time of transient faults in HVDC-VSC systems with hybrid DC breakers
Gatta, F. M.;Lauria, S.
2023
Abstract
The interest in half-bridge Voltage Source Converters (VSCs) with HVDC circuit breakers is a solution to manage transient faults when the link is fully or partially made with an overhead line. The role of the HVDC circuit breaker becomes of paramount importance since to clear transient faults its ability to operate multi reclosures helps to increase the availability of the link. On the other hand, the arc current extinction time on the fault point along the line plays a not negligible role since this time has an impact on the reclosure of the line. Unfortunately, very little can be found in the scientific literature about HVDC breakers. For such reason, in this paper with the aim to study the fault current transients and the stresses an intentionally simplified approach has been adopted with the goal to have a first access to the expected values. The estimation of the arc extinction time of transient pole-to-ground fault in overhead HVDC line, which impacts the minimum dead time for a successful reclosure, is in any case the main aim of this paper. This is a first and necessary step to understand if potential critical issues could be expected. A deeper analysis should be carried out once more details will be available about these technologies.File | Dimensione | Formato | |
---|---|---|---|
De Maria_Assessment of Arc Current_2023.pdf
solo gestori archivio
Tipologia:
Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
337 kB
Formato
Adobe PDF
|
337 kB | Adobe PDF | Contatta l'autore |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.