The strong development of renewable power plants requires the installation of medium voltage underground cable networks which need to be tested with a pragmatic approach and with acceptable timing. This paper describes the tests to be carried out in the field on medium voltage cables before energization, providing rational explanations for each test.
Smart tests for medium voltage cables in renewable energy plants / Di Lorenzo, Gianfranco; Stracqualursi, Erika; Araneo, Rodolfo; Cecere, Riccardo. - (2024), pp. 1-5. (Intervento presentato al convegno 24th EEEIC International Conference on Environment and Electrical Engineering and 8th I and CPS Industrial and Commercial Power Systems Europe, EEEIC/I and CPS Europe 2024 tenutosi a Sapienza University of Rome, Faculty of Engineering, Via Eudossiana, 18, ita) [10.1109/eeeic/icpseurope61470.2024.10751337].
Smart tests for medium voltage cables in renewable energy plants
Di Lorenzo, Gianfranco;Stracqualursi, Erika;Araneo, Rodolfo;
2024
Abstract
The strong development of renewable power plants requires the installation of medium voltage underground cable networks which need to be tested with a pragmatic approach and with acceptable timing. This paper describes the tests to be carried out in the field on medium voltage cables before energization, providing rational explanations for each test.File | Dimensione | Formato | |
---|---|---|---|
Di Lorenzo_Smart Tests for Medium_2024.pdf
solo gestori archivio
Tipologia:
Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
427.53 kB
Formato
Adobe PDF
|
427.53 kB | Adobe PDF | Contatta l'autore |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.