Between 2019 and 2021, a multidisciplinary group, scientifically coordinated by Prof. Simona Salvo, conducted research on the Gio Ponti School of Mathematics - a work from 1935 located within the city of Rome - funded by The Getty Foundation under the "Keeping it Modern" project. After studying the building in all its aspects, the ultimate goal of this multidisciplinary experience was to develop a plan for scheduled conservation. Once the work was completed, all the data was collected in a technical report. Still, there was a spontaneous inquiry into which digital tool could be suitable for conveying its findings. It was decided to experiment and investigate the potential of the H-Bim model, which was, however, introduced ex-post compared to the research process. In conclusion, this contribution aims to address the result of this experience, highlighting the merits, potential, and limitations of HBIM modelling
From Research to Application of HBIM for Conservation Management Plan: The Experience of the School of Mathematics by Gio Ponti in Rome / Cortesi, Marianna. - (2024). (Intervento presentato al convegno International Congress for Heritage Digital Technologies and Tourism Management June 20th – 21st , 2024. Valencia, Spain tenutosi a Valencia) [10.4995/HEDIT2024.2024.17728].
From Research to Application of HBIM for Conservation Management Plan: The Experience of the School of Mathematics by Gio Ponti in Rome
Marianna Cortesi
2024
Abstract
Between 2019 and 2021, a multidisciplinary group, scientifically coordinated by Prof. Simona Salvo, conducted research on the Gio Ponti School of Mathematics - a work from 1935 located within the city of Rome - funded by The Getty Foundation under the "Keeping it Modern" project. After studying the building in all its aspects, the ultimate goal of this multidisciplinary experience was to develop a plan for scheduled conservation. Once the work was completed, all the data was collected in a technical report. Still, there was a spontaneous inquiry into which digital tool could be suitable for conveying its findings. It was decided to experiment and investigate the potential of the H-Bim model, which was, however, introduced ex-post compared to the research process. In conclusion, this contribution aims to address the result of this experience, highlighting the merits, potential, and limitations of HBIM modellingI documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.