The assessment of existing structures is a crucial task upon which rely an effi- cient retrofit design. Bridges are ‘key elements’ of the infrastructural network, and ensuring their good serviceability is of paramount importance. In 2020, in Italy were enacted the ‘Guidelines for the classification, risk management, safety evaluation and monitoring of existing bridges’: the underlying philosophy is to deepen the analysis only on those bridges showing poor maintenance conditions. Prestressed concrete bridges with post-tensioned cables are one of the bridge typologies mostly affected by relevant structural issues and whose assessment is more complicated. In this research, a multiphase methodology is proposed, specifically to be applied to PT bridges. The method is organized in progressive levels of knowledges. The aim is to provide an answer about how to perform the safety assessment of these structures and how deep shall be the preliminary knowledge campaign to consider the PT bridge completely investigated.

A multi-phase survey approach for post-tensioned prestressed concrete bridge decks / Mazzatura, Isabella; Caprili, Silvia; Salvatore, Walter; Lupoi, Alessio; Ficociello, Alessio. - (2023), pp. 3967-3974. (Intervento presentato al convegno Eighth International Symposium on Life-Cycle Civil Engineering tenutosi a Politecnico di Milano) [10.1201/9781003323020-487].

A multi-phase survey approach for post-tensioned prestressed concrete bridge decks

Salvatore, Walter;Lupoi, Alessio;
2023

Abstract

The assessment of existing structures is a crucial task upon which rely an effi- cient retrofit design. Bridges are ‘key elements’ of the infrastructural network, and ensuring their good serviceability is of paramount importance. In 2020, in Italy were enacted the ‘Guidelines for the classification, risk management, safety evaluation and monitoring of existing bridges’: the underlying philosophy is to deepen the analysis only on those bridges showing poor maintenance conditions. Prestressed concrete bridges with post-tensioned cables are one of the bridge typologies mostly affected by relevant structural issues and whose assessment is more complicated. In this research, a multiphase methodology is proposed, specifically to be applied to PT bridges. The method is organized in progressive levels of knowledges. The aim is to provide an answer about how to perform the safety assessment of these structures and how deep shall be the preliminary knowledge campaign to consider the PT bridge completely investigated.
2023
Eighth International Symposium on Life-Cycle Civil Engineering
none
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
A multi-phase survey approach for post-tensioned prestressed concrete bridge decks / Mazzatura, Isabella; Caprili, Silvia; Salvatore, Walter; Lupoi, Alessio; Ficociello, Alessio. - (2023), pp. 3967-3974. (Intervento presentato al convegno Eighth International Symposium on Life-Cycle Civil Engineering tenutosi a Politecnico di Milano) [10.1201/9781003323020-487].
File allegati a questo prodotto
File Dimensione Formato  
Mazzatura_multi-phase_2023.pdf

accesso aperto

Tipologia: Documento in Post-print (versione successiva alla peer review e accettata per la pubblicazione)
Licenza: Creative commons
Dimensione 4.49 MB
Formato Adobe PDF
4.49 MB Adobe PDF

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/1705716
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? ND
social impact