The paper reports a technical-economic comparison for a Turkey high-speed railway line, between 25 kV AC electrification and the use of hybrid trains with on-board storage systems. On-board battery storage systems have been designed to operating in specific parts of the line. Different types of technologies have been taken into account, evaluating the use of high specific power/energy lithium-ion electrochemical cells. The models of the battery pack have been designed in the MATLAB/Simulink environment, in order to carry out the complete operation check, also evaluating the time and power required for recharging. An economic evaluation and comparison have been carried out in order to evaluate the convenience of using a hybrid train on specific part of a real line in order to not totally electrified the line.

A preliminary design of a hybrid train’s on-board batteries for a 25 kV-50 Hz high speed railway line / Ruvio, Alessandro; Bayrak, Onur. - In: JOURNAL OF ENERGY STORAGE. - ISSN 2352-152X. - 84:(2024), pp. 1-18. [10.1016/j.est.2024.110966]

A preliminary design of a hybrid train’s on-board batteries for a 25 kV-50 Hz high speed railway line

Ruvio, Alessandro
Methodology
;
2024

Abstract

The paper reports a technical-economic comparison for a Turkey high-speed railway line, between 25 kV AC electrification and the use of hybrid trains with on-board storage systems. On-board battery storage systems have been designed to operating in specific parts of the line. Different types of technologies have been taken into account, evaluating the use of high specific power/energy lithium-ion electrochemical cells. The models of the battery pack have been designed in the MATLAB/Simulink environment, in order to carry out the complete operation check, also evaluating the time and power required for recharging. An economic evaluation and comparison have been carried out in order to evaluate the convenience of using a hybrid train on specific part of a real line in order to not totally electrified the line.
2024
on board battery storage; catenary-free; hybrid high speed train; high speed line
01 Pubblicazione su rivista::01a Articolo in rivista
A preliminary design of a hybrid train’s on-board batteries for a 25 kV-50 Hz high speed railway line / Ruvio, Alessandro; Bayrak, Onur. - In: JOURNAL OF ENERGY STORAGE. - ISSN 2352-152X. - 84:(2024), pp. 1-18. [10.1016/j.est.2024.110966]
File allegati a questo prodotto
File Dimensione Formato  
Ruvio_A preliminary design_2024.pdf

solo gestori archivio

Tipologia: Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 15.64 MB
Formato Adobe PDF
15.64 MB Adobe PDF   Contatta l'autore

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/1703593
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? 1
social impact