Written with Gaetano De Francesco In the last years a renewed interest emerged regarding the last few months in the life of the Italian architect Giuseppe Terragni and a project that has been considered – ever since it was first published in 1968 – as his last: ‘Cathedral 1943’. Based on the first unpublished reconstruction of the project, performed in the year marking the 100th anniversary of Terragni’s birth, this contribution presents new three-dimensional reconstructions of this captivating, dramatic, and difficult design. The research also focuses on representation to try and capture the underlying spirituality of Terragni’s project rather than create a hyperrealistic effect. It also illustrates the process used to construct the model which, due to its linearity, can assist in the reconstruction of important unbuilt projects – an activity which for many years has been undertaken in the field of representation. The results of the study very clearly show the importance of Giuseppe Terragni’s last project.

The Cathedral designed in 1943 by Giuseppe Terragni. Studies and reconstruction / Saggio, Antonino; DE FRANCESCO, Gaetano. - In: DISEGNARE IDEE IMMAGINI. - ISSN 1123-9247. - 65(2022), pp. 82-95.

The Cathedral designed in 1943 by Giuseppe Terragni. Studies and reconstruction

Antonino Saggio;Gaetano De Francesco
2022

Abstract

Written with Gaetano De Francesco In the last years a renewed interest emerged regarding the last few months in the life of the Italian architect Giuseppe Terragni and a project that has been considered – ever since it was first published in 1968 – as his last: ‘Cathedral 1943’. Based on the first unpublished reconstruction of the project, performed in the year marking the 100th anniversary of Terragni’s birth, this contribution presents new three-dimensional reconstructions of this captivating, dramatic, and difficult design. The research also focuses on representation to try and capture the underlying spirituality of Terragni’s project rather than create a hyperrealistic effect. It also illustrates the process used to construct the model which, due to its linearity, can assist in the reconstruction of important unbuilt projects – an activity which for many years has been undertaken in the field of representation. The results of the study very clearly show the importance of Giuseppe Terragni’s last project.
2022
Rationalism; Giuseppe Terragni; “Terragni Futuro” course; religious buildings; Cathedral 1943; primordial values; three- dimensional reconstruction; rendering;
01 Pubblicazione su rivista::01a Articolo in rivista
The Cathedral designed in 1943 by Giuseppe Terragni. Studies and reconstruction / Saggio, Antonino; DE FRANCESCO, Gaetano. - In: DISEGNARE IDEE IMMAGINI. - ISSN 1123-9247. - 65(2022), pp. 82-95.
File allegati a questo prodotto
File Dimensione Formato  
Saggio_Cattedrale-Terragni_2022.pdf

solo gestori archivio

Tipologia: Documento in Post-print (versione successiva alla peer review e accettata per la pubblicazione)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 2.64 MB
Formato Adobe PDF
2.64 MB Adobe PDF   Contatta l'autore

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/1676686
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? 0
social impact