The energy transition requires an increasing penetration of renewable resources, particularly at MV/LV levels. The emerging production scheme is characterized by distributed power plants, imposes a capillary control of production and consumption among the distribution network (DN). The implementation of demandside response (DSR) campaigns is widely seen as a solution that can increase grid stability, but they require a complex and expensive monitoring infrastructure to select the optimal operating point of the production/consumption systems. This paper suggests a cheap and reliable smart monitoring device based on Raspberry Pi technology. The communication infrastructure adopted in the smart building of ASM S.p.A., the distribution system operator (DSO) of Terni city, shows the feasibility of implementing this prototype on a large scale.
A Low-Cost Smart Monitoring Device for Demand-Side Response Campaigns / Geri, A.; Gatta, F. M.; Maccioni, M.; Dell'Olmo, J.; Carere, F.; Bucarelli, M. A.; Poursoltan, P.; Hadifar, N.; Paulucci, M.. - 448:(2022), pp. 593-603. (Intervento presentato al convegno Seventh International Congress on Information and Communication Technology tenutosi a Virtual conference) [10.1007/978-981-19-1610-6_52].
A Low-Cost Smart Monitoring Device for Demand-Side Response Campaigns
Geri A.;Gatta F. M.;Maccioni M.;Dell'Olmo J.;Carere F.
;Bucarelli M. A.;Poursoltan P.;
2022
Abstract
The energy transition requires an increasing penetration of renewable resources, particularly at MV/LV levels. The emerging production scheme is characterized by distributed power plants, imposes a capillary control of production and consumption among the distribution network (DN). The implementation of demandside response (DSR) campaigns is widely seen as a solution that can increase grid stability, but they require a complex and expensive monitoring infrastructure to select the optimal operating point of the production/consumption systems. This paper suggests a cheap and reliable smart monitoring device based on Raspberry Pi technology. The communication infrastructure adopted in the smart building of ASM S.p.A., the distribution system operator (DSO) of Terni city, shows the feasibility of implementing this prototype on a large scale.File | Dimensione | Formato | |
---|---|---|---|
Geri_Low-Cost_2022.pdf
solo gestori archivio
Tipologia:
Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
467 kB
Formato
Adobe PDF
|
467 kB | Adobe PDF | Contatta l'autore |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.