The traditional workflows used to define construction costs are characterized by a series of common criticalities due to physiological inefficiencies of analogical or not-completely-digital processes. These include the waste of man-hours due to continuous requests for clarification by the computer scientist, or the transmission of partial or unverified information by the design team, or even inaccurate and approximate measurements based on 2D drawings. This can lead to lower levels of reliability of cost estimations with consequent design risks and the need for variants in progress, exceeding the project budget or the expected timeframe. The BIM approach can mitigate these risks, but it is necessary to define a planned and robust method that supports the consistency between the items of calculation and the elements of the model. This method needs to be based on a structured breakdown of the building and the activities necessary to the project, according to a clearly planned methodology. Therefore, it is necessary to define an approach capable of generating digital workflows and automatically updating quantities (especially in the event of changes to the project), as well as to ensure the correspondence between modelled elements and computation items, in order to have a consistent workflow and make immediate and clear the updating of information on each project document. The paper is oriented to the definition of a structure for cost planning process, which uses the experimentation of computer tools aimed at extracting the quantities directly from the model, allowing the automatic update in case of changes, through the use of a PBS (project breakdown structure), shared with the entire design team, and using a code system associated with the elements of the model, the calculation, but also to specialist reports, detailed graphics and schedules.

5d bim: Tools and methods for digital project construction management / Agostinelli, S.; Cinquepalmi, F.; Ruperto, F.. - 192:(2019), pp. 205-215. (Intervento presentato al convegno 3rd International conference on building information modelling in design, construction and operations, BIM 2019 tenutosi a Seville; Spain) [10.2495/BIM190181].

5d bim: Tools and methods for digital project construction management

Agostinelli S.;Cinquepalmi F.;Ruperto F.
2019

Abstract

The traditional workflows used to define construction costs are characterized by a series of common criticalities due to physiological inefficiencies of analogical or not-completely-digital processes. These include the waste of man-hours due to continuous requests for clarification by the computer scientist, or the transmission of partial or unverified information by the design team, or even inaccurate and approximate measurements based on 2D drawings. This can lead to lower levels of reliability of cost estimations with consequent design risks and the need for variants in progress, exceeding the project budget or the expected timeframe. The BIM approach can mitigate these risks, but it is necessary to define a planned and robust method that supports the consistency between the items of calculation and the elements of the model. This method needs to be based on a structured breakdown of the building and the activities necessary to the project, according to a clearly planned methodology. Therefore, it is necessary to define an approach capable of generating digital workflows and automatically updating quantities (especially in the event of changes to the project), as well as to ensure the correspondence between modelled elements and computation items, in order to have a consistent workflow and make immediate and clear the updating of information on each project document. The paper is oriented to the definition of a structure for cost planning process, which uses the experimentation of computer tools aimed at extracting the quantities directly from the model, allowing the automatic update in case of changes, through the use of a PBS (project breakdown structure), shared with the entire design team, and using a code system associated with the elements of the model, the calculation, but also to specialist reports, detailed graphics and schedules.
2019
3rd International conference on building information modelling in design, construction and operations, BIM 2019
5D; BIM uses; cost estimation; rules set
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
5d bim: Tools and methods for digital project construction management / Agostinelli, S.; Cinquepalmi, F.; Ruperto, F.. - 192:(2019), pp. 205-215. (Intervento presentato al convegno 3rd International conference on building information modelling in design, construction and operations, BIM 2019 tenutosi a Seville; Spain) [10.2495/BIM190181].
File allegati a questo prodotto
File Dimensione Formato  
Agostinelli_5D BIM_2019.pdf

accesso aperto

Tipologia: Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza: Creative commons
Dimensione 374.63 kB
Formato Adobe PDF
374.63 kB Adobe PDF

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/1650292
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? ND
social impact