ARAMIS project aims at assessing the risk level of an industrial site. To reach this goal, the environment, as a target, must be studied and taken into account. On the base of a multicriteria decision approach (Saaty method), a structured methodology is proposed. In the first step an identification of generic targets is made in order to assess, in a second step, their vulnerability. The expected results are cartographical representations of the index of vulnerability V which represents the vulnerability of an area in the surroundings of an industrial site. This methodology must be implemented into a geographical information system (G.I.S.) in order to devise an operational tool to evaluate the vulnerability for the competent authorities, the industrialist and the risk experts

Assessment of the environmental vulnerability in the surrounding of an aindustrial site / Tixier, J.; Dandrieux, A.; Dusserre, G.; Bubbico, Roberto; Luccone, L. G.; Carta, R.; Silvetti, B.; Mazzarotta, Barbara; DI CAVE, Sergio; Hubert, E.; Rodrigues, N.; Salvi, O.; Gaston, D.. - STAMPA. - 2:(2003), pp. 1543-1551. (Intervento presentato al convegno 14th European Safety and Reliability Conference (ESREL 2003) tenutosi a MAASTRICHT, NETHERLANDS nel JUN 15-18, 2003).

Assessment of the environmental vulnerability in the surrounding of an aindustrial site

BUBBICO, Roberto;MAZZAROTTA, Barbara;DI CAVE, Sergio;
2003

Abstract

ARAMIS project aims at assessing the risk level of an industrial site. To reach this goal, the environment, as a target, must be studied and taken into account. On the base of a multicriteria decision approach (Saaty method), a structured methodology is proposed. In the first step an identification of generic targets is made in order to assess, in a second step, their vulnerability. The expected results are cartographical representations of the index of vulnerability V which represents the vulnerability of an area in the surroundings of an industrial site. This methodology must be implemented into a geographical information system (G.I.S.) in order to devise an operational tool to evaluate the vulnerability for the competent authorities, the industrialist and the risk experts
2003
14th European Safety and Reliability Conference (ESREL 2003)
Vulnerability; environment; industrial installation
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Assessment of the environmental vulnerability in the surrounding of an aindustrial site / Tixier, J.; Dandrieux, A.; Dusserre, G.; Bubbico, Roberto; Luccone, L. G.; Carta, R.; Silvetti, B.; Mazzarotta, Barbara; DI CAVE, Sergio; Hubert, E.; Rodrigues, N.; Salvi, O.; Gaston, D.. - STAMPA. - 2:(2003), pp. 1543-1551. (Intervento presentato al convegno 14th European Safety and Reliability Conference (ESREL 2003) tenutosi a MAASTRICHT, NETHERLANDS nel JUN 15-18, 2003).
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/163020
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact