This work deals with the problem of enabling plug-in electric vehicles (PEV) to the provisioning of ancillary services to the grid, for frequency regulation purposes. The paper presents and discusses a reference scenario for such a use case, describing the systems and actors involved. A system architecture for enabling the use case is proposed, detailing the relevant system components, technologies, and control algorithms. The paper also discusses the issue of the coexistence of the PEV-based frequency regulation services with PEV smart charging. Finally, it is discussed the crucial role that 5G technologies could play for making actually feasible the implementation of the proposed scheme for PEV-based frequency regulation service provisioning.
On the participation of charging point operators to the frequency regulation service using plug-in electric vehicles and 5G communications / Germana', Roberto; De Santis, Emanuele; Liberati, Francesco; Di Giorgio, Alessandro. - (2021). (Intervento presentato al convegno 21ST International Conference on Environment and Electrical Engineering (EEEIC) tenutosi a Bari, Italia) [10.1109/EEEIC/ICPSEurope51590.2021.9584495].
On the participation of charging point operators to the frequency regulation service using plug-in electric vehicles and 5G communications
Roberto Germanà
Primo
;Emanuele De Santis;Francesco Liberati;Alessandro Di Giorgio
2021
Abstract
This work deals with the problem of enabling plug-in electric vehicles (PEV) to the provisioning of ancillary services to the grid, for frequency regulation purposes. The paper presents and discusses a reference scenario for such a use case, describing the systems and actors involved. A system architecture for enabling the use case is proposed, detailing the relevant system components, technologies, and control algorithms. The paper also discusses the issue of the coexistence of the PEV-based frequency regulation services with PEV smart charging. Finally, it is discussed the crucial role that 5G technologies could play for making actually feasible the implementation of the proposed scheme for PEV-based frequency regulation service provisioning.File | Dimensione | Formato | |
---|---|---|---|
Germana_Preprint_On_the_Participation_2021.pdf
accesso aperto
Note: DOI: 10.1109/EEEIC/ICPSEurope51590.2021.9584495
Tipologia:
Documento in Pre-print (manoscritto inviato all'editore, precedente alla peer review)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
640.55 kB
Formato
Adobe PDF
|
640.55 kB | Adobe PDF | |
Germana_On_the_Participation_2021.pdf
solo gestori archivio
Tipologia:
Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
737.09 kB
Formato
Adobe PDF
|
737.09 kB | Adobe PDF | Contatta l'autore |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.