The large increase of renewable distributed generation envisaged in the next future is yielding multiple concerns to the Transmission System Operators (TSOs). In particular, the connection requests to the EHV - HV network have to be appropriately included in planning studies, considering a rate of concretization of renewable generation initiatives and RES penetration targets in order to account for energy policies. Furthermore, the progressive decommissioning of thermal power plants in the medium/long term introduces additional complexities for both network planning and operation. In this paper, a real case study of the Italian power system is analyzed in the presence of HV operation islands (open loops at double-busbar substations) in static regime during critical contingencies, in a future energy scenario. The identified network reinforcements allow to alleviate the overloads and to improve the system performances.

Assessment of transmission network development with HV operation islands under renewable diffusion / Migliori, M.; Lauria, S.; Gadaleta, C.; Aluisio, B.; De Cesare, A.; Forte, G.. - (2021), pp. 1-5. (Intervento presentato al convegno 2021 IEEE Madrid PowerTech, PowerTech 2021 tenutosi a Madrid; Spain) [10.1109/PowerTech46648.2021.9495075].

Assessment of transmission network development with HV operation islands under renewable diffusion

Migliori M.
Primo
Methodology
;
Lauria S.;
2021

Abstract

The large increase of renewable distributed generation envisaged in the next future is yielding multiple concerns to the Transmission System Operators (TSOs). In particular, the connection requests to the EHV - HV network have to be appropriately included in planning studies, considering a rate of concretization of renewable generation initiatives and RES penetration targets in order to account for energy policies. Furthermore, the progressive decommissioning of thermal power plants in the medium/long term introduces additional complexities for both network planning and operation. In this paper, a real case study of the Italian power system is analyzed in the presence of HV operation islands (open loops at double-busbar substations) in static regime during critical contingencies, in a future energy scenario. The identified network reinforcements allow to alleviate the overloads and to improve the system performances.
2021
2021 IEEE Madrid PowerTech, PowerTech 2021
contingency analysis; load-flow analysis; Operation islands; RES integration
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Assessment of transmission network development with HV operation islands under renewable diffusion / Migliori, M.; Lauria, S.; Gadaleta, C.; Aluisio, B.; De Cesare, A.; Forte, G.. - (2021), pp. 1-5. (Intervento presentato al convegno 2021 IEEE Madrid PowerTech, PowerTech 2021 tenutosi a Madrid; Spain) [10.1109/PowerTech46648.2021.9495075].
File allegati a questo prodotto
File Dimensione Formato  
Migliori_Assessment_2021.pdf

solo gestori archivio

Tipologia: Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 1.42 MB
Formato Adobe PDF
1.42 MB Adobe PDF   Contatta l'autore

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/1567770
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 5
  • ???jsp.display-item.citation.isi??? 0
social impact