Urban waste management is becoming an increasingly complex task, absorbing a huge amount of resources, and having a major environmental impact. The design of a waste management system consists in various activities, and one of these is related to the definition of shift schedules for both personnel and vehicles. This activity has a great incidence on the tactical and operational cost for companies. In this paper, we propose an integer programming model to find an optimal solution to the integrated problem. The aim is to determine optimal schedules at minimum cost. Moreover, we design a fast and effective heuristic to face large-size problems. Both approaches are tested on data from a real-world case in Southern Italy and compared to the current practice utilized by the company managing the service, showing that simultaneously solving these problems can lead to significant monetary savings. (C) 2013 Elsevier Ltd. All rights reserved.

Simultaneous personnel and vehicle shift scheduling in the waste management sector / Ghiani, G; Guerriero, E; Manni, A; Manni, E; Potenza, A. - In: WASTE MANAGEMENT. - ISSN 0956-053X. - 33:7(2013), pp. 1589-1594. [10.1016/j.wasman.2013.04.001]

Simultaneous personnel and vehicle shift scheduling in the waste management sector

Guerriero E;
2013

Abstract

Urban waste management is becoming an increasingly complex task, absorbing a huge amount of resources, and having a major environmental impact. The design of a waste management system consists in various activities, and one of these is related to the definition of shift schedules for both personnel and vehicles. This activity has a great incidence on the tactical and operational cost for companies. In this paper, we propose an integer programming model to find an optimal solution to the integrated problem. The aim is to determine optimal schedules at minimum cost. Moreover, we design a fast and effective heuristic to face large-size problems. Both approaches are tested on data from a real-world case in Southern Italy and compared to the current practice utilized by the company managing the service, showing that simultaneously solving these problems can lead to significant monetary savings. (C) 2013 Elsevier Ltd. All rights reserved.
2013
01 Pubblicazione su rivista::01a Articolo in rivista
Simultaneous personnel and vehicle shift scheduling in the waste management sector / Ghiani, G; Guerriero, E; Manni, A; Manni, E; Potenza, A. - In: WASTE MANAGEMENT. - ISSN 0956-053X. - 33:7(2013), pp. 1589-1594. [10.1016/j.wasman.2013.04.001]
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/1500801
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 12
  • ???jsp.display-item.citation.isi??? 11
social impact