Nowadays, Distributed System Operators (DSOs) are facing more and more difficult challenges in meeting the user needs with an increasing overall power demand, at the same time guaranteeing the required level of reliability. A possible solutions is offered by the Demand Response (DR) management, aiming to reduce the total load demand of the distribution system during peak periods in order to maintain the integrity of the network and stability of the whole system. The paper analyses different scenarios based on real data from the distribution grid of Milan (Italy), evaluating benefits and costs of DR implementation in three different plants, to solve problems related to feeders congestion, power losses, and voltage drops, through either the scheduling or remote control of distributed resources. Moreover, load shape considerations suggests the possibility to integrate in the system a higher share of photovoltaic (PV) generation, of which the effects on DR are also evaluated in the paper.
Flexible resources dispatching to assist DR management in urban distribution network scenarios including PV generation. An Italian case study / Iannarelli, G.; Bosisio, A.; Greco, B.; Moscatiello, C.; Boccaletti, C.. - (2020), pp. 1-6. (Intervento presentato al convegno 2020 IEEE International conference on environment and electrical engineering and 2020 IEEE industrial and commercial power systems Europe, EEEIC / I and CPS Europe 2020 tenutosi a Madrid; Spain) [10.1109/EEEIC/ICPSEurope49358.2020.9160856].
Flexible resources dispatching to assist DR management in urban distribution network scenarios including PV generation. An Italian case study
Iannarelli G.;Greco B.;Moscatiello C.;Boccaletti C.
2020
Abstract
Nowadays, Distributed System Operators (DSOs) are facing more and more difficult challenges in meeting the user needs with an increasing overall power demand, at the same time guaranteeing the required level of reliability. A possible solutions is offered by the Demand Response (DR) management, aiming to reduce the total load demand of the distribution system during peak periods in order to maintain the integrity of the network and stability of the whole system. The paper analyses different scenarios based on real data from the distribution grid of Milan (Italy), evaluating benefits and costs of DR implementation in three different plants, to solve problems related to feeders congestion, power losses, and voltage drops, through either the scheduling or remote control of distributed resources. Moreover, load shape considerations suggests the possibility to integrate in the system a higher share of photovoltaic (PV) generation, of which the effects on DR are also evaluated in the paper.File | Dimensione | Formato | |
---|---|---|---|
Mazzoli_Dynamic Analysis_2020.pdf
solo gestori archivio
Tipologia:
Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
634.87 kB
Formato
Adobe PDF
|
634.87 kB | Adobe PDF | Contatta l'autore |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.