The availability of three-core, XLPE-insulated AC HV and EHV cables is allowing the installation of very long AC cable systems. Accurate and reliable cable models are necessary in order to assess the behaviour of such cables, especially as regards temporary overvoltages and harmonic resonances. The three-core submarine cable models currently available in electromagnetic transient simulation software are based on linearized pipe-type cables and besides they do not account for conductor and armour stranding. The paper presents the results of an extensive frequency-domain field measurement campaign carried out in the 0-2500 Hz range on the 98.5 km long submarine stretch of the Malta-Sicily cable interconnection. Currently available cable models are then checked against measurements. Results show that a correct choice of armour parameters allows for a good agreement between the classical cable model and field measurements.

Field measurements and model comparison for a very long submarine HV AC three-core cable / Palone, F.; Gatta, F. M.; Geri, A.; Lauria, S.; Maccioni, M.; Ceresoli, B.. - (2019). (Intervento presentato al convegno 2019 IEEE Milan PowerTech, PowerTech 2019 tenutosi a Milan; Italy) [10.1109/PTC.2019.8810570].

Field measurements and model comparison for a very long submarine HV AC three-core cable

Gatta F. M.;Geri A.;Lauria S.;Maccioni M.
;
2019

Abstract

The availability of three-core, XLPE-insulated AC HV and EHV cables is allowing the installation of very long AC cable systems. Accurate and reliable cable models are necessary in order to assess the behaviour of such cables, especially as regards temporary overvoltages and harmonic resonances. The three-core submarine cable models currently available in electromagnetic transient simulation software are based on linearized pipe-type cables and besides they do not account for conductor and armour stranding. The paper presents the results of an extensive frequency-domain field measurement campaign carried out in the 0-2500 Hz range on the 98.5 km long submarine stretch of the Malta-Sicily cable interconnection. Currently available cable models are then checked against measurements. Results show that a correct choice of armour parameters allows for a good agreement between the classical cable model and field measurements.
2019
2019 IEEE Milan PowerTech, PowerTech 2019
cable armour; cable models; field measurements; finite sections; frequency-domain
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Field measurements and model comparison for a very long submarine HV AC three-core cable / Palone, F.; Gatta, F. M.; Geri, A.; Lauria, S.; Maccioni, M.; Ceresoli, B.. - (2019). (Intervento presentato al convegno 2019 IEEE Milan PowerTech, PowerTech 2019 tenutosi a Milan; Italy) [10.1109/PTC.2019.8810570].
File allegati a questo prodotto
File Dimensione Formato  
Palone_Field measurements_2019.pdf

solo gestori archivio

Tipologia: Documento in Post-print (versione successiva alla peer review e accettata per la pubblicazione)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 567.48 kB
Formato Adobe PDF
567.48 kB Adobe PDF   Contatta l'autore

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/1369297
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 8
  • ???jsp.display-item.citation.isi??? 0
social impact