Strip line Beam Positions Monitors (BPMs) are the main devices used for non-intercepting position measurement for the electron LINAC of ELI-NP (Extreme Light Infrastructure - Nuclear Physics). All the 29 BPMs have the same design, with the exception of the one installed in one of the dump line, which has a much larger acceptance than the others. BPMs will also be used to measure the charge of the beam, by measuring the sum of the pickups signals and calibrating it with beam charge monitors installed along the LINAC. An analytical model has been developed for the proposed BPMs. This model has been checked by means of electromagnetic simulations, in order to obtain the pickups signals at the passage of the beam and to study the effects of BPMs non-linearities, particularly on charge measurements. Details of the analytical model, results of the numerical simulations and the correction algorithm proposed for charge measurements are described in this paper.

Stripline beam position monitor modelling and simulations for charge measurements / Castorina, Giovanni; Franzini, Giovanni; Marongiu, Marco; Mostacci, Andrea; Nosych, Andriy; Spataro, Bruno. - (2017). (Intervento presentato al convegno International Beam Instrumentation Conference 2017 tenutosi a Grand Rapids, Michigan, USA) [10.18429/jacow-ibic2017-tupcf16].

Stripline beam position monitor modelling and simulations for charge measurements

Giovanni Castorina;Giovanni Franzini;Marco Marongiu;Andrea Mostacci;Bruno Spataro
2017

Abstract

Strip line Beam Positions Monitors (BPMs) are the main devices used for non-intercepting position measurement for the electron LINAC of ELI-NP (Extreme Light Infrastructure - Nuclear Physics). All the 29 BPMs have the same design, with the exception of the one installed in one of the dump line, which has a much larger acceptance than the others. BPMs will also be used to measure the charge of the beam, by measuring the sum of the pickups signals and calibrating it with beam charge monitors installed along the LINAC. An analytical model has been developed for the proposed BPMs. This model has been checked by means of electromagnetic simulations, in order to obtain the pickups signals at the passage of the beam and to study the effects of BPMs non-linearities, particularly on charge measurements. Details of the analytical model, results of the numerical simulations and the correction algorithm proposed for charge measurements are described in this paper.
2017
International Beam Instrumentation Conference 2017
Stripline Beam Position Monitors ELI-NP Diagnostics
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Stripline beam position monitor modelling and simulations for charge measurements / Castorina, Giovanni; Franzini, Giovanni; Marongiu, Marco; Mostacci, Andrea; Nosych, Andriy; Spataro, Bruno. - (2017). (Intervento presentato al convegno International Beam Instrumentation Conference 2017 tenutosi a Grand Rapids, Michigan, USA) [10.18429/jacow-ibic2017-tupcf16].
File allegati a questo prodotto
File Dimensione Formato  
Castorina_Striplinebeamposition_2017.pdf

accesso aperto

Tipologia: Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 1.05 MB
Formato Adobe PDF
1.05 MB Adobe PDF

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/1182666
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? ND
social impact