At 12:51 pm local time on 22 February 2011, a Mw 6.2 aftershock of the September 4, 2010, Darfield Earthquake shook the city of Christchurch, New Zealand. The aftershock occurred on an unmapped fault less than 8 km from the city center resulting in the collapse of two reinforced concrete office buildings and one concrete parking garage, and severe damage to numerous others. The region has continued to suffer from aftershocks and further damage to building structures throughout the year following the February earthquake. This paper summarizes the observed damage to buildings in the Central Business District (CBD), with a specific focus on identifying future research to support the development of performance-based design procedures. © Springer Science+Business Media Dordrecht 2014.

Performance-Based Issues from the 22 February 2011 Christchurch Earthquake / Elwood, Kenneth J; Pampanin, Stefano; Kam, Weng Yuen; Priestley, Nigel. - STAMPA. - 32(2014), pp. 159-175. [10.1007/978-94-017-8875-5_12].

Performance-Based Issues from the 22 February 2011 Christchurch Earthquake

PAMPANIN, STEFANO;
2014

Abstract

At 12:51 pm local time on 22 February 2011, a Mw 6.2 aftershock of the September 4, 2010, Darfield Earthquake shook the city of Christchurch, New Zealand. The aftershock occurred on an unmapped fault less than 8 km from the city center resulting in the collapse of two reinforced concrete office buildings and one concrete parking garage, and severe damage to numerous others. The region has continued to suffer from aftershocks and further damage to building structures throughout the year following the February earthquake. This paper summarizes the observed damage to buildings in the Central Business District (CBD), with a specific focus on identifying future research to support the development of performance-based design procedures. © Springer Science+Business Media Dordrecht 2014.
2014
Performance-Based Seismic Engineering: Vision for an Earthquake Resilient Society
9789401788748
Christchurch earthquake; Code changes; Collapse; Concrete buildings; Ground motions; Precast moment frames; Repair costs; Shear walls; Geotechnical Engineering and Engineering Geology
02 Pubblicazione su volume::02a Capitolo o Articolo
Performance-Based Issues from the 22 February 2011 Christchurch Earthquake / Elwood, Kenneth J; Pampanin, Stefano; Kam, Weng Yuen; Priestley, Nigel. - STAMPA. - 32(2014), pp. 159-175. [10.1007/978-94-017-8875-5_12].
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/822371
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 5
  • ???jsp.display-item.citation.isi??? ND
social impact