The essay investigates the relationship between contract termination and dilatory exceptions, with specific reference to cases in which the peremptory remedy is called upon to react to events that occurred before the expiration of the time limit for the obligations’ execution or during the pendency of a condition precedent. In such cases, so-called anticipatory breach, providing the performance guarantee is in fact materially impossible or unnecessary.
Rimedio dilatorio “anticipato” e risoluzione del contratto / Addis, Fabio. - (2025), pp. 15-53. - HISTORY, LAW & LEGAL HISTORY.
Rimedio dilatorio “anticipato” e risoluzione del contratto
fabio addis
2025
Abstract
The essay investigates the relationship between contract termination and dilatory exceptions, with specific reference to cases in which the peremptory remedy is called upon to react to events that occurred before the expiration of the time limit for the obligations’ execution or during the pendency of a condition precedent. In such cases, so-called anticipatory breach, providing the performance guarantee is in fact materially impossible or unnecessary.File allegati a questo prodotto
| File | Dimensione | Formato | |
|---|---|---|---|
|
Addis_Rimedio_2025.pdf
solo gestori archivio
Tipologia:
Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
496.48 kB
Formato
Adobe PDF
|
496.48 kB | Adobe PDF | Contatta l'autore |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


