In the framework of the National Operational Programme 2007-13 “Research and Competitiveness”, co-funded by the European Regional Development Fund, the Ministry of Research (MIUR) financed the project “AN INTEGRATED SYSTEMS FOR HYDROGEOLOGICAL RISK MONITORING, EARLY WARNING AND MITIGATION ALONG THE MAIN LIFELINES” with the acronym LEWIS (Landslides Early Warning Integrated System). The project aims to develop an integrated, innovative and efficient solution to manage risk issues associated with infrastructure, on landslide-prone slopes by developing and testing a system able to identify potentially dangerous landslides in a timely manner, and to activate all needed measures for impact mitigation, including information delivery. The system includes many components: standard criteria for evaluation and mapping landslides susceptibility: monitoring equipment for measuring the onset of landslide movement; telecommunication networks; mathematical models for both triggering and propagation of landslides induced by rainfall; models for risk scenario forecasting; a centre for data acquisition and processing; and a traffic control centre.

TXT-tool 2.039-4.2 LEWIS Project: An Integrated System for Landslides Early Warning / Versace, P.; Capparelli, G.; De Luca, D. L.. - (2017), pp. 509-535. [10.1007/978-3-319-57774-6_38].

TXT-tool 2.039-4.2 LEWIS Project: An Integrated System for Landslides Early Warning

De Luca D. L.
2017

Abstract

In the framework of the National Operational Programme 2007-13 “Research and Competitiveness”, co-funded by the European Regional Development Fund, the Ministry of Research (MIUR) financed the project “AN INTEGRATED SYSTEMS FOR HYDROGEOLOGICAL RISK MONITORING, EARLY WARNING AND MITIGATION ALONG THE MAIN LIFELINES” with the acronym LEWIS (Landslides Early Warning Integrated System). The project aims to develop an integrated, innovative and efficient solution to manage risk issues associated with infrastructure, on landslide-prone slopes by developing and testing a system able to identify potentially dangerous landslides in a timely manner, and to activate all needed measures for impact mitigation, including information delivery. The system includes many components: standard criteria for evaluation and mapping landslides susceptibility: monitoring equipment for measuring the onset of landslide movement; telecommunication networks; mathematical models for both triggering and propagation of landslides induced by rainfall; models for risk scenario forecasting; a centre for data acquisition and processing; and a traffic control centre.
2017
Landslide Dynamics: ISDR-ICL Landslide Interactive Teaching Tools: Volume 1: Fundamentals, Mapping and Monitoring
9783319577739
9783319577746
early warning systems; landslide forecasting; risk scenarios
02 Pubblicazione su volume::02a Capitolo o Articolo
TXT-tool 2.039-4.2 LEWIS Project: An Integrated System for Landslides Early Warning / Versace, P.; Capparelli, G.; De Luca, D. L.. - (2017), pp. 509-535. [10.1007/978-3-319-57774-6_38].
File allegati a questo prodotto
File Dimensione Formato  
Versace_TXT-tool-2.039-4.2_2017.pdf

solo gestori archivio

Note: capitolo
Tipologia: Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 2.21 MB
Formato Adobe PDF
2.21 MB Adobe PDF   Contatta l'autore

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/1705733
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 4
  • ???jsp.display-item.citation.isi??? ND
social impact