As mentioned in Chapters 2 and 7, tunnelling process has to be inspired by risk management strategies. For each hazard and in each tunnelling phase (planning/feasibility study, engineering or construction), risk is individuated/assessed/evaluated. When the assessed risk is considered to be acceptable, mitigation measures are not necessary; when not, according to the tunnelling phase, mitigation measures have to be defined/designed/implemented. This chapter is devoted to the presentation of the design approaches to the most common mitigation measures (Chapter 8).
Assessment of the excavation-related hazards and design of mitigation measures / di Prisco, C.; Callari, C.; Barbero, M.; Bilotta, E.; Russo, G.; Boldini, D.; Desideri, A.; Flessati, L.; Graziani, A.; Luciani, A.; Meda, A.; Pescara, M.; Plizzari, G.; Tiberti, G.; Sciotti, A.. - (2022), pp. 247-316.
Assessment of the excavation-related hazards and design of mitigation measures
Boldini D.;Desideri A.;
2022
Abstract
As mentioned in Chapters 2 and 7, tunnelling process has to be inspired by risk management strategies. For each hazard and in each tunnelling phase (planning/feasibility study, engineering or construction), risk is individuated/assessed/evaluated. When the assessed risk is considered to be acceptable, mitigation measures are not necessary; when not, according to the tunnelling phase, mitigation measures have to be defined/designed/implemented. This chapter is devoted to the presentation of the design approaches to the most common mitigation measures (Chapter 8).File | Dimensione | Formato | |
---|---|---|---|
di-Prisco_Assessment-excavation-related_2022.pdf
solo gestori archivio
Tipologia:
Documento in Post-print (versione successiva alla peer review e accettata per la pubblicazione)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
2.76 MB
Formato
Adobe PDF
|
2.76 MB | Adobe PDF | Contatta l'autore |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.