Digital tools and techniques, also because of the recent restrictions caused by the pandemic, have gained an almost necessary role in human activities. The construction sector, which is structurally slower in metabolising innovation, has a significant productivity gap when compared with manufacturing. This research therefore analyses the management methodologies used today for construction and proposes, through the principles of reactive programming and an integrated use of BIM and IT tools, a tested methodology capable of increasing the productivity and quality of the construction process on building sites.
Towards the reactive building process management. BIM and AI techniques to improve time and cost optimisation in construction sites / Rossini, FRANCESCO LIVIO. - (2022), pp. 15-158.
Towards the reactive building process management. BIM and AI techniques to improve time and cost optimisation in construction sites
Rossini
2022
Abstract
Digital tools and techniques, also because of the recent restrictions caused by the pandemic, have gained an almost necessary role in human activities. The construction sector, which is structurally slower in metabolising innovation, has a significant productivity gap when compared with manufacturing. This research therefore analyses the management methodologies used today for construction and proposes, through the principles of reactive programming and an integrated use of BIM and IT tools, a tested methodology capable of increasing the productivity and quality of the construction process on building sites.File | Dimensione | Formato | |
---|---|---|---|
Rossini_Towards-reactive-building_2022.pdf
solo gestori archivio
Note: tabedizioni.it
Tipologia:
Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza:
Tutti i diritti riservati (All rights reserved)
Dimensione
3.78 MB
Formato
Adobe PDF
|
3.78 MB | Adobe PDF | Contatta l'autore |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.