The opportunities provided by the introduction of IT tools into the building process have not brought yet substantial changes in building design process, which is still anchored to traditional process paradigm. That is, design phases are rigidly subdivided in “boxes”, that contain the knowledge required to related phases, while others are reciprocally separated by semantic barriers. Moreover, differently from other industrial sectors where the quality is verified by means of prototypes to be tested and improved, in construction sector the quality cannot be assured as those methodologies, because each building is, de facto, the prototype of itself. It is needed to define a new design paradigm, based on advanced methodologies and digital simulation tools, capable to predict in advance design and construction behaviors. To reach this objective, an IT simulative system based on concurrent Hybrid Actor is presented. The outcome of this approach is an optimized design process.

Introduction to Proactive Design. Toward the implementation of BIM methodology for managing complexity in architectural projects / Novembri, Gabriele; Rossini, FRANCESCO LIVIO; Fioravanti, Antonio. - (2020), pp. 11-13. - ADVANCES IN SCIENCE, TECHNOLOGY & INNOVATION.

Introduction to Proactive Design. Toward the implementation of BIM methodology for managing complexity in architectural projects.

Gabriele Novembri
Primo
;
Francesco Rossini
Secondo
;
Antonio Fioravanti
Ultimo
2020

Abstract

The opportunities provided by the introduction of IT tools into the building process have not brought yet substantial changes in building design process, which is still anchored to traditional process paradigm. That is, design phases are rigidly subdivided in “boxes”, that contain the knowledge required to related phases, while others are reciprocally separated by semantic barriers. Moreover, differently from other industrial sectors where the quality is verified by means of prototypes to be tested and improved, in construction sector the quality cannot be assured as those methodologies, because each building is, de facto, the prototype of itself. It is needed to define a new design paradigm, based on advanced methodologies and digital simulation tools, capable to predict in advance design and construction behaviors. To reach this objective, an IT simulative system based on concurrent Hybrid Actor is presented. The outcome of this approach is an optimized design process.
2020
Sustainability and Automation in Smart Constructions
978-3-030-35532-6
proactive design; artificial intelligence; architectural design theory; project management; BIM
02 Pubblicazione su volume::02a Capitolo o Articolo
Introduction to Proactive Design. Toward the implementation of BIM methodology for managing complexity in architectural projects / Novembri, Gabriele; Rossini, FRANCESCO LIVIO; Fioravanti, Antonio. - (2020), pp. 11-13. - ADVANCES IN SCIENCE, TECHNOLOGY & INNOVATION.
File allegati a questo prodotto
File Dimensione Formato  
Novembri_Introduction-proactive-design_2020.pdf

solo gestori archivio

Note: https://link.springer.com/chapter/10.1007/978-3-030-35533-3_2
Tipologia: Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 8.01 MB
Formato Adobe PDF
8.01 MB Adobe PDF   Contatta l'autore

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/1444568
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact