Nome |
# |
Very long distance connection of gigawatt size offshore wind farms: extra high-voltage ac versus high-voltage dc cost comparison, file e3835314-b615-15e8-e053-a505fe0a3de9
|
533
|
Tower grounding improvement versus line surge arresters: comparison of remedial measures for high-BFOR subtransmission lines, file e3835314-b617-15e8-e053-a505fe0a3de9
|
343
|
An equivalent circuit for the evaluation of cross-country fault currents in medium voltage (MV) distribution networks, file e3835320-d46d-15e8-e053-a505fe0a3de9
|
253
|
Application of a LiFePO4 Battery Energy Storage System to Primary Frequency Control: Simulations and Experimental Results, file e383532a-570f-15e8-e053-a505fe0a3de9
|
145
|
Lightning performance evaluation of Italian 150 kV sub-transmission lines, file e3835327-79df-15e8-e053-a505fe0a3de9
|
111
|
Single-Pole Autoreclosure in uncompensated EHV AC mixed overhead-cable lines. A parametric time-domain analysis, file 140fe250-77fb-41c8-a8fd-5b5c8caceaf6
|
104
|
Monte Carlo evaluation of the impact of subsequent strokes on backflashover rate, file e3835316-7f54-15e8-e053-a505fe0a3de9
|
100
|
Clarke transform based fast assessment of switching overvoltages in an MV distribution network, file 4f654a83-8858-40bf-959e-e1abb5bfc0d3
|
66
|
Very long distance connection of gigawatt size offshore wind farms: extra high-voltage ac versus high-voltage dc cost comparison, file e383532a-f05a-15e8-e053-a505fe0a3de9
|
34
|
Power system adequacy: an efficient procedure based on genetic algorithms, file e3835311-f420-15e8-e053-a505fe0a3de9
|
29
|
Temporary overvoltages due to ground faults in MV networks, file e3835312-05fd-15e8-e053-a505fe0a3de9
|
27
|
Short Circuit and induced voltage transient study on a planned 1000 MW HVDC-VSC cable link, file e3835313-a931-15e8-e053-a505fe0a3de9
|
27
|
Recent trends in power systems modeling and analysis, file a6afe165-d4c6-44cb-82c5-14cc1c97bb50
|
14
|
Steady-state Operation of Very Long EHV AC Cable Lines, file e3835311-c931-15e8-e053-a505fe0a3de9
|
10
|
A remedial action optimizer for the flow-based capacity calculation, file 6789349f-06d2-40d7-b392-c7906b62dd0e
|
6
|
Hydropower in the decarbonization of the Italian electricity system, file 8cbd60c4-7f19-42f7-a959-27c94526e819
|
5
|
Equivalent lumped parameter II-network of standard grounding systems under surge conditions, file e383531e-1722-15e8-e053-a505fe0a3de9
|
5
|
Connection of very large public charging station to the hv transmission grid, file e3835314-4a26-15e8-e053-a505fe0a3de9
|
4
|
A methodologic approach to evaluate service dependability of a high-speed railway line, file e3835316-750f-15e8-e053-a505fe0a3de9
|
4
|
Evaluation of thermal performance for power system development, file e3835328-44dd-15e8-e053-a505fe0a3de9
|
4
|
Sardinia as a 100% renewable power system. A frequency stability study, file 3d5569ff-576f-477a-9adf-c38118db9e98
|
3
|
Design of a low-voltage mock-up of a new multi-terminal italian HVDC transmission system, file a86c1125-cb80-4acc-ad06-226eda4e124f
|
3
|
Hybrid and pi-circuit approaches for grounding system lightning response, file e3835316-276c-15e8-e053-a505fe0a3de9
|
3
|
Sistemi HVDC per l’integrazione di rinnovabile: nuovo collegamento adriatico, file e3835324-1ee7-15e8-e053-a505fe0a3de9
|
3
|
Switching overvoltages and polarity reversal in presence of HVDC circuit breakers, file 10bbaf39-00c0-4ab5-b332-1685e1fdfb17
|
2
|
Flexibility services to power systems from smart rural microgrid prosumers, file 20a96881-aa23-466a-bccd-4da23d175b9b
|
2
|
Design and operation of EHV transmission lines including long insulated cable and overhead sections, file 764d67f5-c4a1-4e03-a71c-878617de2f57
|
2
|
null, file aad10175-94c3-4709-8e30-3cdc5eddd44b
|
2
|
Single-Pole Autoreclosure in uncompensated EHV AC mixed overhead-cable lines. A parametric time-domain analysis, file cf93366b-3b12-4cee-8612-a0cdc2a5e6f6
|
2
|
Simplified HV tower grounding system model for backflashover simulation, file e3835313-a92f-15e8-e053-a505fe0a3de9
|
2
|
Fault current increase due to the progressive undergrounding of HV subtransmission network, file e3835314-2cfc-15e8-e053-a505fe0a3de9
|
2
|
Comparison of corona models for computing the surge propagation in multiconductor power lines, file e3835315-6de5-15e8-e053-a505fe0a3de9
|
2
|
Monte Carlo evaluation of the impact of subsequent strokes on backflashover rate, file e3835316-4a60-15e8-e053-a505fe0a3de9
|
2
|
Design approaches for EHV OHL 'compact' tower grounding systems, file e3835317-dd31-15e8-e053-a505fe0a3de9
|
2
|
Simplified HV tower grounding system model for backflashover simulation, file e383531e-672d-15e8-e053-a505fe0a3de9
|
2
|
Advances in HV transmission systems, file e3835323-7065-15e8-e053-a505fe0a3de9
|
2
|
Large temporary overvoltages in MV network due to a series fault in the HV subtransmission system, file e383532d-031a-15e8-e053-a505fe0a3de9
|
2
|
Countermeasures for reduction of screen currents due to cross country faults in MV cable distribution networks, file 21aaf31a-656f-42bc-9890-d2725ac2029b
|
1
|
Reactive power flows and voltage issues in urban distribution and subtransmission networks, file 2248279a-4157-4a53-94b9-c14c7afb49c6
|
1
|
Loadability curves for the new Terna's '5F' high capacity overhead lines, file 3c8bbe1e-f8fe-4910-aa8c-0aaa3bb7f1ac
|
1
|
Temporary Overvoltages due to Harmonic Resonance in Long EHV Cables, file 4030fcf9-4154-4778-9eab-726460bb6792
|
1
|
Planning studies for the Gabon-Congo interconnector. Static and dynamic transfer limits, file 44e7c9a0-1f45-4ca5-a12e-9971b9177ae6
|
1
|
Clarke transform based fast assessment of switching overvoltages in an MV distribution network, file 4ff7f61f-26e5-4e8c-adc0-324cee10cae2
|
1
|
Integration of passenger road transport in a fully renewable electric power system dominated by variable generation, file 65c6e34b-8c85-4c92-b559-ca2af15453f0
|
1
|
Analytical methods for series compensation of a transmission line, file 911011f8-4eb4-42db-b195-521b1202bf9f
|
1
|
HVAC Submarine Cable Loss Reduction at Variable Voltage Level, file b0daedf0-89ec-4a68-b136-3e08110f1616
|
1
|
A global DC branch model incorporating power system flexibility, file c4d4ea94-59d9-4afe-b3ea-1f74d629accf
|
1
|
Power frequency secondary arc current in uncompensated EHV AC mixed cable-overhead lines, file e3835313-a688-15e8-e053-a505fe0a3de9
|
1
|
An ATP-EMTP Monte Carlo procedure for backflashover rate evaluation: A comparison with the CIGRE method, file e3835313-a929-15e8-e053-a505fe0a3de9
|
1
|
Mediterranean high voltage submarine cable links: Technology and system challenges, file e3835313-a92d-15e8-e053-a505fe0a3de9
|
1
|
Protection system studies for ENEL Distribuzione's mv loop lines, file e3835314-2bc4-15e8-e053-a505fe0a3de9
|
1
|
Voltage quality studies in electric power systems: An AC/DC network for a shipboard application, file e3835316-3ea5-15e8-e053-a505fe0a3de9
|
1
|
Arc-flash in large battery energy storage systems - Hazard calculation and mitigation, file e3835316-5fb0-15e8-e053-a505fe0a3de9
|
1
|
Modelling of battery energy storage systems under faulted conditions: Assessment of protection systems behaviour, file e3835316-5fba-15e8-e053-a505fe0a3de9
|
1
|
Statistical lightning simulations for a HV mixed overhead-cable line: Preliminary studies, file e3835316-6ea4-15e8-e053-a505fe0a3de9
|
1
|
An optimization procedure to evaluate the service performances in high-speed railway lines under fault conditions, file e3835316-7604-15e8-e053-a505fe0a3de9
|
1
|
Optimal power flow application to EHVAC interconnections for GW-sized Offshore Wind Farms, file e3835316-7c4b-15e8-e053-a505fe0a3de9
|
1
|
Operation of a medium voltage distribution network with a large penetration of distributed generation, file e3835316-8afe-15e8-e053-a505fe0a3de9
|
1
|
Cross-country fault protection in ENEL Distribuzione's experimental MV loop lines, file e3835316-8b26-15e8-e053-a505fe0a3de9
|
1
|
Battery energy storage efficiency calculation including auxiliary losses: Technology comparison and operating strategies, file e3835316-9037-15e8-e053-a505fe0a3de9
|
1
|
Cost evaluation of EHVAC offshore wind farm interconnections using intermediate shunt compensation: A parametric study, file e3835316-92e7-15e8-e053-a505fe0a3de9
|
1
|
Replacing diesel generators with hybrid renewable power plants: Giglio smart island project, file e3835317-f0b9-15e8-e053-a505fe0a3de9
|
1
|
Analysis of the lightning transient response of the earthing system of large-scale ground-mounted PV plants, file e383531a-48e9-15e8-e053-a505fe0a3de9
|
1
|
Frequency analysis of PLC over HV transmission lines with segmented shield wires, file e383531a-68f5-15e8-e053-a505fe0a3de9
|
1
|
Detection of cross-country faults in medium voltage distribution ring lines, file e383531b-1bc9-15e8-e053-a505fe0a3de9
|
1
|
Arc flash in large energy storage systems. Hazard calculation and mitigation, file e383531b-2a87-15e8-e053-a505fe0a3de9
|
1
|
Replacing Diesel Generators with Hybrid Renewable Power Plants: Giglio Smart Island Project, file e3835320-d469-15e8-e053-a505fe0a3de9
|
1
|
New HVDC technology in Pan-European power system planning, file e3835323-6a6b-15e8-e053-a505fe0a3de9
|
1
|
Renewable sources integration using HVDC in parallel to AC traditional system: the Adriatic project, file e3835324-0ce6-15e8-e053-a505fe0a3de9
|
1
|
Uprating studies for a 230 kv-50 Hz overhead line, file e3835324-1b96-15e8-e053-a505fe0a3de9
|
1
|
Lightning performance evaluation of Italian 150 kV sub-transmission lines, file e3835324-bc92-15e8-e053-a505fe0a3de9
|
1
|
Field measurements and model comparison for a very long submarine HV AC three-core cable, file e3835324-fd8d-15e8-e053-a505fe0a3de9
|
1
|
Possible technical solutions for the new Sardinia-Corsica-Italy link, file e3835325-7665-15e8-e053-a505fe0a3de9
|
1
|
Smart Grid and Microgrid Cooperation in a Real Distribution Network under Emergency Conditions, file e3835329-4cce-15e8-e053-a505fe0a3de9
|
1
|
Limitation of cross country fault currents in MV distribution networks by current limiting reactors connected between cable screens and primary substation earth electrode, file e383532f-082d-15e8-e053-a505fe0a3de9
|
1
|
Technical/economic feasibility of the adequacy of a fully renewable power system: The case study of the Sardinia island, file e383532f-309e-15e8-e053-a505fe0a3de9
|
1
|
Totale |