The renovation and widening of the cruise terminal of the Port of Civitavecchia made it necessary to reconsider the safety of the quay on the 'Colombo' breakwater rear-side, and therefore to evaluate the protecting efficiency of this breakwater and parapet wall, particularly against wave overtopping. An intensive laboratory investigation on the breakwater overtopping performance was carried out at the 'Laboratorio di Idraulica Ambientale e Marittima' (LIAM) of the University of L'Aquila in order to optimise a new breakwater design. Both rubble mound and composite breakwaters with several different parapet walls were studied by means of a 2D physical model in scale 1 to 35. The present paper concentrates on the rubble mound breakwater tests, and illustrates both criteria and results of the wave overtopping investigation.

Laboratory investigation on wave overtopping of rubble mound breakwaters: the Port of Civitavecchia case / Beltrami, G. M.; DI RISIO, M.; DE GIROLAMO, Paolo; Noli, A.. - 2006:(2005), pp. 211-220. (Intervento presentato al convegno International Conference on Coastlines, Structures and Breakwaters 2005 tenutosi a London; United Kingdom).

Laboratory investigation on wave overtopping of rubble mound breakwaters: the Port of Civitavecchia case

DE GIROLAMO, Paolo;
2005

Abstract

The renovation and widening of the cruise terminal of the Port of Civitavecchia made it necessary to reconsider the safety of the quay on the 'Colombo' breakwater rear-side, and therefore to evaluate the protecting efficiency of this breakwater and parapet wall, particularly against wave overtopping. An intensive laboratory investigation on the breakwater overtopping performance was carried out at the 'Laboratorio di Idraulica Ambientale e Marittima' (LIAM) of the University of L'Aquila in order to optimise a new breakwater design. Both rubble mound and composite breakwaters with several different parapet walls were studied by means of a 2D physical model in scale 1 to 35. The present paper concentrates on the rubble mound breakwater tests, and illustrates both criteria and results of the wave overtopping investigation.
2005
International Conference on Coastlines, Structures and Breakwaters 2005
Parapet wall; Port of Civitavecchia; Rubble mound breakwaters
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Laboratory investigation on wave overtopping of rubble mound breakwaters: the Port of Civitavecchia case / Beltrami, G. M.; DI RISIO, M.; DE GIROLAMO, Paolo; Noli, A.. - 2006:(2005), pp. 211-220. (Intervento presentato al convegno International Conference on Coastlines, Structures and Breakwaters 2005 tenutosi a London; United Kingdom).
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/557535
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? ND
social impact