Superconducting insertion devices (IDs) have higher fields for a given gap and period length compared with the state-of-the-art technology of permanent magnet IDs. One of the still open issues for the development of superconducting insertion devices is the understanding of the heat intake from the electron beam. With the aim of measuring the beam heat load to a cold bore and the hope to gain a deeper understanding in the underlying mechanisms, a cold vacuum chamber for diagnostics was built. It is equipped with the following instrumentation: retarding field analyzers to measure the electron flux, temperature sensors to measure the beam heat load, pressure gauges, and mass spectrometers to measure the gas content. The flexibility of the engineering design will allow the installation of the cryostat in different synchrotron light sources. The installation in the storage ring of the Diamond Light Source is foreseen in November 2011. Here we report about the technical design of this device, the factory acceptance test and the planned measurements with electron beam. Copyright © 2011 by IPAC'11/EPS-AG.

Factory acceptance test of colddiag: A cold vacuum chamber for diagnostics / S., Gertstl; Mostacci, Andrea. - STAMPA. - (2011), pp. 3263-3265. (Intervento presentato al convegno 2nd International Particle Accelerator Conference, IPAC 2011 tenutosi a Kursaal, San Sebastian nel 4 September 2011 through 9 September 2011).

Factory acceptance test of colddiag: A cold vacuum chamber for diagnostics

MOSTACCI, Andrea
2011

Abstract

Superconducting insertion devices (IDs) have higher fields for a given gap and period length compared with the state-of-the-art technology of permanent magnet IDs. One of the still open issues for the development of superconducting insertion devices is the understanding of the heat intake from the electron beam. With the aim of measuring the beam heat load to a cold bore and the hope to gain a deeper understanding in the underlying mechanisms, a cold vacuum chamber for diagnostics was built. It is equipped with the following instrumentation: retarding field analyzers to measure the electron flux, temperature sensors to measure the beam heat load, pressure gauges, and mass spectrometers to measure the gas content. The flexibility of the engineering design will allow the installation of the cryostat in different synchrotron light sources. The installation in the storage ring of the Diamond Light Source is foreseen in November 2011. Here we report about the technical design of this device, the factory acceptance test and the planned measurements with electron beam. Copyright © 2011 by IPAC'11/EPS-AG.
2011
2nd International Particle Accelerator Conference, IPAC 2011
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Factory acceptance test of colddiag: A cold vacuum chamber for diagnostics / S., Gertstl; Mostacci, Andrea. - STAMPA. - (2011), pp. 3263-3265. (Intervento presentato al convegno 2nd International Particle Accelerator Conference, IPAC 2011 tenutosi a Kursaal, San Sebastian nel 4 September 2011 through 9 September 2011).
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/418853
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? ND
social impact