The new high speed railway lines, under construction in Italy, are electrified in 2times25 kHz - 50 Hz and, in order to avoid interference problems between traction and signaling current, make use of a signaling system based on audio frequency track circuits (AF-TC), ranging from 2.1 kHz to 16.5 kHz. Problems could arise from the fact that traction currents required by high-speed locomotives, equipped with electronic static converters, show a harmonic spectrum which includes audio frequencies. Since the tracks are means of propagation of both traction and signaling currents, interference problems in the standard operation can occur with possible impact on transportation regularity. Thus, preliminary studies of the compatibility between traction and signaling system (where the traction load is a disturbance source and the signaling circuit is a disturbance victim), under standard and failure conditions, are required. In this context, a measurement campaign on the AF-TC of the new high speed railway system Rome-Naples has been made and some results are reported in this paper

Measurement of Traction Current Harmonics on the Track Circuits of the Rome – Naples High – Speed Railway / GIULII CAPPONI, Fabio; L., DEL FERRARO; Caricchi, Federico Attilio; E., Fedeli. - STAMPA. - (2006), pp. 1090-1094. (Intervento presentato al convegno SPEEDAM’06 Symposium tenutosi a Taormina (Italia) nel 23-26 maggio 2006) [10.1109/SPEEDAM.2006.1649930].

Measurement of Traction Current Harmonics on the Track Circuits of the Rome – Naples High – Speed Railway

GIULII CAPPONI, Fabio;CARICCHI, Federico Attilio;
2006

Abstract

The new high speed railway lines, under construction in Italy, are electrified in 2times25 kHz - 50 Hz and, in order to avoid interference problems between traction and signaling current, make use of a signaling system based on audio frequency track circuits (AF-TC), ranging from 2.1 kHz to 16.5 kHz. Problems could arise from the fact that traction currents required by high-speed locomotives, equipped with electronic static converters, show a harmonic spectrum which includes audio frequencies. Since the tracks are means of propagation of both traction and signaling currents, interference problems in the standard operation can occur with possible impact on transportation regularity. Thus, preliminary studies of the compatibility between traction and signaling system (where the traction load is a disturbance source and the signaling circuit is a disturbance victim), under standard and failure conditions, are required. In this context, a measurement campaign on the AF-TC of the new high speed railway system Rome-Naples has been made and some results are reported in this paper
2006
SPEEDAM’06 Symposium
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
Measurement of Traction Current Harmonics on the Track Circuits of the Rome – Naples High – Speed Railway / GIULII CAPPONI, Fabio; L., DEL FERRARO; Caricchi, Federico Attilio; E., Fedeli. - STAMPA. - (2006), pp. 1090-1094. (Intervento presentato al convegno SPEEDAM’06 Symposium tenutosi a Taormina (Italia) nel 23-26 maggio 2006) [10.1109/SPEEDAM.2006.1649930].
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/232265
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 5
  • ???jsp.display-item.citation.isi??? 0
social impact